
Four Section Boom Operation-aerial EEC-0081
V1.3
Four Section Boom Operation
Y.
Position sheave and sheave pin located in cable loop on top of 3
rd
to allow
capscrew installation through top plate of 2
nd
. Install capscrews and torque to
specification, clamping sheave pin and sheave to the bottom of the 2
nd
section.
Z.
Assemble retract sheaves, retract sheave pins and cable keeper plates in rear of
2
nd
section. Coat surfaces of bearings with grease and assemble extend sheaves
on sheave pin.
AA.
Place retract cables anchored to 3
rd
over top of retract sheaves attached
to rear of 2
nd
. Install keeper capscrew above sheave to hold retract cables in
place.
BB.
Reeve cables over retract sheave and install keeper/wear pad to bottom
rear of 2
nd
section. This pad acts as a side pad, bottom pad and a cable retainer.
CC.
Assemble exterior extend cylinder components. Install and center sheave
pin case end of extend cylinder. Install bearings into extend cable sheaves. Coat
surface of bearings with grease and assemble extend sheaves on sheave pin.
DD.
Wrap approximately 10 feet (300cm) of each diameter 2/3/4 extend cable
around extend sheaves and install 4
th
section extend cable anchor around cables
at button end. Do not tighten capscrews clamping anchor together completely.
These capscrews if tightened completely will not allow cable anchor to install into
4
th
section.
EE.
Install wear pad over extend cylinder sheave side plates. This serves as a
wear pad to keep the end of the extend cylinder centered in the boom, as well as
an extend cable retainer.
FF.
Slide extend cylinder/extend cables into 2
nd
-3
rd
-4
th
boom assembly
enough to assemble extend cable anchor into bottom rear of 4
th
section (See
Figure 1 on next page). Be aware of extend cable location when inserting
cylinder into boom sections, inadvertent crushing or other damage to cables will
warrant replacement.
GG.
Tighten capscrews clamping extend cable anchor together. This will also
lock anchor in place in the anchor cutouts in the 4
th
section.
Содержание E190
Страница 2: ......
Страница 64: ...Hirschmann J1939 Install EEC 0110 V1 0 Hirschmann J1939 Network Installation...
Страница 72: ...Hirschmann J1939 Install EEC 0110 V1 0 Hirschmann J1939 Network Installation...
Страница 75: ...Hirschmann J1939 Install EEC 0110 V1 0 Hirschmann J1939 Network Installation...
Страница 140: ......
Страница 141: ......
Страница 146: ...TITLE...
Страница 147: ...TITLE...
Страница 149: ...TITLE...
Страница 150: ...TITLE...
Страница 151: ...TITLE...
Страница 152: ...TITLE...
Страница 153: ......
Страница 154: ......
Страница 155: ......
Страница 156: ......
Страница 157: ...TITLE...
Страница 158: ...TITLE...
Страница 159: ...TITLE...
Страница 160: ...TITLE...
Страница 161: ...TITLE...
Страница 162: ...TITLE...
Страница 173: ...Bolt Torque EEC 0016 V1 2 Bolt Torque...
Страница 179: ...Four Section Boom Operation aerial EEC 0081 V1 3 Four Section Boom Operation...
Страница 199: ...Five Section Boom Operation aerial EEC 0080 V1 3 Five Section Boom Operation...
Страница 227: ......
Страница 230: ...1 INFORMAZIONI GENERALI GENERAL INFORMATION...
Страница 248: ...8 ACCESSORI PER ARGANI DA SOLLEVAMENTO E TRAINO LIFTING AND RECOVERY WINCH ACCESSORIES...
Страница 265: ...11 TABELLE DI CONVERSIONE CONVERSION TABLES...
Страница 268: ...12 CONDIZIONI GENERALI DI VENDITA CONDITIONS OF SALE...
Страница 275: ...G SERVICE LITERATURE 52 60 SWING SERVICE LIT Sel 0007 DOC Rev 1 5200 SERIES 6000 SERIES SWING DRIVE SERVICE MANUAL...
Страница 279: ...4 5200S...
Страница 280: ...5 6000S...
Страница 287: ...Document number S071 Revision C Date 2011 10 17 Document type Manual SERVICE MANUAL Remote Control System RC400 G2B G3B...
Страница 333: ......
Страница 334: ......
Страница 357: ...Appendix B Parts Index ELLIOTT Built for You E190 Manual B 1...