49
FIGURE 7.38: CUTTING DURAVENT POLYPRO HORIZONTAL CONCENTRIC VENT TERMINAL
6. Installation of DuraVent PolyPro Horizontal Concentric Vent Terminal (Terminal Option D) -
Install PolyPro Horizontal Concentric Termination Kit #2PPS-HK or #3PPS-HK (Figure 7.39) as follows:
a. At the planned location cut a 4-1/8” round hole for the 2” terminal or a 5-1/8” round hole for the 3” terminal in the
exterior wall. (See Part VII-A of this manual for permitted terminal locations).
b. If desired, the terminal can be shortened. Mark the desired location of the cut on the outer pipe no closer than 2”
#&%## ' % & |#
pipe as shown in Figure 7.38 and maintain this dimension after cutting the outer pipe. All cuts must be square and
de-burred.
c. Attach the exterior wall plate and seal all around with weather resistant RTV.
d. Slide the cap through the exterior wall plate and hole from the outside of the building and orient the termination so
the air intake slots face down. The cap must be installed level or sloped 1/8” per foot away from the appliance.
e. Seal the termination to the exterior wall plate with weather resistant RTV.
f.
Slide the interior wall plate over the termination and attach to the wall from inside the room.
g. Attach the interior wall plate to the termination with the provided hardware.
h. Install gaskets into co-linear adapter.
i.
Attach co-linear adapter to horizontal termination and orient so that the side outlet on the adapter is on or above the
horizontal plane.
7. Vertical Installations using PolyPro Vertical Concentric Termination Kit #2PPS-VK or #3PPS-VK (Figure 7.40):
a. Cut a hole in the roof large enough to clear the concentric terminal at the location of the terminal (see Part VII-A of
this manual for permitted terminal locations).
b. # %&) %# & %^ %#&
## %&&& %### %# %%
accepted practice for the type of roof on the installation.
c. &#) ## %) &## %
d. Plumb the termination and mount the support bracket to the structure.
e. Install gaskets into co-linear adapter.
f.
Attach co-linear adapter to vertical termination.
Содержание PHNTM080
Страница 2: ......
Страница 9: ...7 Figure 4 1 Minimum Clearances To Combustible Construction...
Страница 11: ...9 Figure 5 1 Wall Layout Mounting Hole Location...
Страница 12: ...10 Figure 5 2 Boiler Mounting Bracket Installation Boiler Wall Mounting...
Страница 39: ...37 FIGURE 7 24 SPLIT VENT SYSTEM FLEX IN ABANDONED MASONRY CHIMNEY VENT OPTIONS 33 38...
Страница 63: ...61 This page is intentionally left blank...
Страница 68: ...66 FIGURE 9 2 PIPING METHOD 1 NEAR BOILER PIPING HEATING ONLY...
Страница 69: ...67 FIGURE 9 3A PIPING METHOD 1 NEAR BOILER PIPING HEATING PLUS INDIRECT WATER HEATER IWH OFF PRIMARY LOOP...
Страница 70: ...68 FIGURE 9 3B PIPING METHOD 1 NEAR BOILER PIPING HEATING PLUS INDIRECT WATER HEATER IWH OFF BOILER LOOP...
Страница 72: ...70 FIGURE 9 6 PIPING METHOD 1 NEAR BOILER PIPING SHADED BOILER LOOP...
Страница 80: ...78 FIGURE 10 2 HIGH VOLTAGE PCB TERMINAL CONNECTIONS FIGURE 10 3 LOW VOLTAGE PCB TERMINAL CONNECTIONS...
Страница 82: ...80 FIGURE 10 4 PROPER INSTALLATION OF HEADER SENSOR...
Страница 84: ...82 FIGURE 10 6 INTERNAL WIRING CONNECTIONS DIAGRAM...
Страница 85: ...83...
Страница 92: ...90 Lighting and Operating Instructions...
Страница 98: ...96 FIGURE 12 2 PIPING FOR DHW OPTIONS 1 2 ALSO SEE FIGURES 9 3A 9 3B FIGURE 12 3 PIPING FOR DHW OPTION 3...
Страница 101: ...99 FIGURE 12 5 SETTINGS MENU SEE PART C FOR ADDITIONAL INFORMATION...
Страница 113: ...111 FIGURE 13 2 IGNITION ELECTRODE GAP FIGURE 13 3 CONDENSATE TRAP EXPLODED PARTS VIEW...
Страница 125: ...123...
Страница 127: ...125 40 33 31 27 28 34 35 37 38 32 39 36 29 30 48 Blower Gas Valve Assembly for 80 100 120...
Страница 128: ...126 31 28 27 32 44 42 29 41 45 38 47 30 43 35 46 34 36 33 39 Blower Gas Valve Assembly for 150 180...
Страница 129: ...127...
Страница 131: ...129...
Страница 132: ...130...
Страница 133: ...131...
Страница 135: ...133...
Страница 137: ...135 140 141 142 143 144 145...