124
KEY
#
DESCRIPTION
QTY. OR
CROWN
PN
QUANTITY PER BOILER OR CROWN
PART NUMBER
80
100
120
150
180
27
M5 x 20mm SET SCREW
9000021
4 EA
4 EA
4 EA
4 EA
4 EA
28
BLOWER OUTLET GASKET
430030
1 EA
1 EA
1 EA
1 EA
1 EA
29
M5 LOCKNUT
900003
4 EA
4 EA
4 EA
4 EA
4 EA
30
CSST GAS LINE ASSEMBLY
430037
1 EA
1 EA
1 EA
1 EA
1 EA
31
CSST GAS LINE FLANGE GASKET
430038
1 EA
1 EA
1 EA
1 EA
1 EA
32
AIR PROVING PRESSURE SWITCH
430009
1 EA
1 EA
1 EA
1 EA
1 EA
33
SILCONE TUBING (5/16” ID)
430060
1 EA
1 EA
1 EA
1 EA
1 EA
34
CSST x 1/2” NPT ADAPTER
230715
1 EA
1 EA
1 EA
1 EA
1 EA
35
GAS VALVE FLANGE KIT
3507326
1 EA
1 EA
1 EA
1 EA
1 EA
36
BLOWER, NRV118 WITH #533 VENTURI
1 EA
430032
430032
36
BLOWER, NRV118 WITH #532 VENTURI
1 EA
430033
36
BLOWER, RG148/1200-3633
1 EA
430034
430034
37
RUBBER COUPLING
430035
1 EA
1 EA
1 EA
38
GAS ORIFICE, 5.25 mm
1 EA
3507332
38
GAS ORIFICE, 5.00 mm
1 EA
3507333
38
GAS ORIFICE, 6.50 mm
1 EA
3507334
38
GAS ORIFICE, 7.00 mm
1 EA
3507339
3507339
39
GAS VALVE, GB-ND 055 E01 S00
1 EA
3507370
3507370
3507370
39
GAS VALVE, GB-WND 055 D01 S00 LH
1 EA
3507375
3507375
40
RECTIFIER MODULE
3507371
1 EA
1 EA
1 EA
41
RECTIFIER PLUG w/ M4 X 30mm CONNECTOR SCREW
3507372
1 EA
1 EA
42
BLOWER INLET SHROUD ASSEMBLY
WITH 9.0 mm RED SWIRLPLATE
1 EA
430045
42
BLOWER INLET SHROUD ASSEMBLY
WITH 12.0 mm GRAY SWIRLPLATE
1 EA
430046
43
M4 x 8mm TORX HEAD SCREW
900244
4 EA
4 EA
44
M4 x 25mm TRI-LOBULAR TORX SELF THREADING SCREW
3 EA
900245
44
M4 x 29mm TRI-LOBULAR TORX SELF THREADING SCREW
3 EA
900246
45
ATTENUATOR ASSEMBLY
430040
1 EA
1 EA
46
#8 x 18 SHEET METAL SCREW (1-1/2”)
900247
1 EA
1 EA
47
1/2” NPT 90° STREET ELBOW
950056
1 EA
1 EA
48
M5 X 16mm TORX HEAD SCREW
900016
2 EA
2 EA
2 EA
Содержание PHNTM080
Страница 2: ......
Страница 9: ...7 Figure 4 1 Minimum Clearances To Combustible Construction...
Страница 11: ...9 Figure 5 1 Wall Layout Mounting Hole Location...
Страница 12: ...10 Figure 5 2 Boiler Mounting Bracket Installation Boiler Wall Mounting...
Страница 39: ...37 FIGURE 7 24 SPLIT VENT SYSTEM FLEX IN ABANDONED MASONRY CHIMNEY VENT OPTIONS 33 38...
Страница 63: ...61 This page is intentionally left blank...
Страница 68: ...66 FIGURE 9 2 PIPING METHOD 1 NEAR BOILER PIPING HEATING ONLY...
Страница 69: ...67 FIGURE 9 3A PIPING METHOD 1 NEAR BOILER PIPING HEATING PLUS INDIRECT WATER HEATER IWH OFF PRIMARY LOOP...
Страница 70: ...68 FIGURE 9 3B PIPING METHOD 1 NEAR BOILER PIPING HEATING PLUS INDIRECT WATER HEATER IWH OFF BOILER LOOP...
Страница 72: ...70 FIGURE 9 6 PIPING METHOD 1 NEAR BOILER PIPING SHADED BOILER LOOP...
Страница 80: ...78 FIGURE 10 2 HIGH VOLTAGE PCB TERMINAL CONNECTIONS FIGURE 10 3 LOW VOLTAGE PCB TERMINAL CONNECTIONS...
Страница 82: ...80 FIGURE 10 4 PROPER INSTALLATION OF HEADER SENSOR...
Страница 84: ...82 FIGURE 10 6 INTERNAL WIRING CONNECTIONS DIAGRAM...
Страница 85: ...83...
Страница 92: ...90 Lighting and Operating Instructions...
Страница 98: ...96 FIGURE 12 2 PIPING FOR DHW OPTIONS 1 2 ALSO SEE FIGURES 9 3A 9 3B FIGURE 12 3 PIPING FOR DHW OPTION 3...
Страница 101: ...99 FIGURE 12 5 SETTINGS MENU SEE PART C FOR ADDITIONAL INFORMATION...
Страница 113: ...111 FIGURE 13 2 IGNITION ELECTRODE GAP FIGURE 13 3 CONDENSATE TRAP EXPLODED PARTS VIEW...
Страница 125: ...123...
Страница 127: ...125 40 33 31 27 28 34 35 37 38 32 39 36 29 30 48 Blower Gas Valve Assembly for 80 100 120...
Страница 128: ...126 31 28 27 32 44 42 29 41 45 38 47 30 43 35 46 34 36 33 39 Blower Gas Valve Assembly for 150 180...
Страница 129: ...127...
Страница 131: ...129...
Страница 132: ...130...
Страница 133: ...131...
Страница 135: ...133...
Страница 137: ...135 140 141 142 143 144 145...