26
$!
A)*(BI?BB*JD((
C)@?(BB?*@BA)()
((-
Table 7.13b: Summary of Vertical “B-Vent Air Chase” Vent Options
(B-Vent Chase MUST Be Sealed)
Option
18
19
20
21
Illustrated in Figure
7.19
7.19
7.20
7.20
Pipe Penetration
Through Structure
Vent
Roof
Roof
Roof
Roof
Intake
Roof
Roof
Roof
Roof
Material
Vent
DuraVent
PolyPro
(Rigid/Flex)
DuraVent
PolyPro
(Rigid/Flex)
Centrotherm
InnoFlue
SW/Flex
Centrotherm
InnoFlue
SW/Flex
Intake
B Vent/PVC
B Vent/PVC
B Vent/PVC
B Vent/PVC
Nominal Diameter
Vent
2”
3”
2”
3”
Intake
2” or 3”
3”
2” or 3”
3”
Min B Vent ID
5”
6”
5”
6”
Min Equivalent Vent Length:
Models
080
36”
36”
36”
36”
100
36”
36”
36”
36”
120
Not Permitted
36”
Not Permitted
36”
150
52”
52”
180
52”
52”
Max Equivalent Vent Length (Note 1):
Models
080
60ft
135ft
60ft
135ft
100
60ft
135ft
60ft
135ft
120
Not Permitted
135ft
Not Permitted
135ft
150
135ft
135ft
180
135ft
135ft
|~^*
Termination/Components Required
2PPS-VFT
2PPS-BV*
2PPS-FLEX**
3PPS-VFT
3PPS-BV*
3PPS-FLEX**
IFBK02****
IAWP02B
IFBK03****
IAWP03B
* Specify size of B vent (e.g. 2PPS-BV
6
is for use with 6” B vent)
** Specify length in feet.
**** Specify Flex length and B-vent diameter (e.g. IFBK02
2505
&+*&&' #)`
Note 1: Max vent lengths shown also apply to the intake. Flex vent reduces the maximum allowable vent length. See equivalent
%#*)#' $& { %*%+
Содержание PHNTM080
Страница 2: ......
Страница 9: ...7 Figure 4 1 Minimum Clearances To Combustible Construction...
Страница 11: ...9 Figure 5 1 Wall Layout Mounting Hole Location...
Страница 12: ...10 Figure 5 2 Boiler Mounting Bracket Installation Boiler Wall Mounting...
Страница 39: ...37 FIGURE 7 24 SPLIT VENT SYSTEM FLEX IN ABANDONED MASONRY CHIMNEY VENT OPTIONS 33 38...
Страница 63: ...61 This page is intentionally left blank...
Страница 68: ...66 FIGURE 9 2 PIPING METHOD 1 NEAR BOILER PIPING HEATING ONLY...
Страница 69: ...67 FIGURE 9 3A PIPING METHOD 1 NEAR BOILER PIPING HEATING PLUS INDIRECT WATER HEATER IWH OFF PRIMARY LOOP...
Страница 70: ...68 FIGURE 9 3B PIPING METHOD 1 NEAR BOILER PIPING HEATING PLUS INDIRECT WATER HEATER IWH OFF BOILER LOOP...
Страница 72: ...70 FIGURE 9 6 PIPING METHOD 1 NEAR BOILER PIPING SHADED BOILER LOOP...
Страница 80: ...78 FIGURE 10 2 HIGH VOLTAGE PCB TERMINAL CONNECTIONS FIGURE 10 3 LOW VOLTAGE PCB TERMINAL CONNECTIONS...
Страница 82: ...80 FIGURE 10 4 PROPER INSTALLATION OF HEADER SENSOR...
Страница 84: ...82 FIGURE 10 6 INTERNAL WIRING CONNECTIONS DIAGRAM...
Страница 85: ...83...
Страница 92: ...90 Lighting and Operating Instructions...
Страница 98: ...96 FIGURE 12 2 PIPING FOR DHW OPTIONS 1 2 ALSO SEE FIGURES 9 3A 9 3B FIGURE 12 3 PIPING FOR DHW OPTION 3...
Страница 101: ...99 FIGURE 12 5 SETTINGS MENU SEE PART C FOR ADDITIONAL INFORMATION...
Страница 113: ...111 FIGURE 13 2 IGNITION ELECTRODE GAP FIGURE 13 3 CONDENSATE TRAP EXPLODED PARTS VIEW...
Страница 125: ...123...
Страница 127: ...125 40 33 31 27 28 34 35 37 38 32 39 36 29 30 48 Blower Gas Valve Assembly for 80 100 120...
Страница 128: ...126 31 28 27 32 44 42 29 41 45 38 47 30 43 35 46 34 36 33 39 Blower Gas Valve Assembly for 150 180...
Страница 129: ...127...
Страница 131: ...129...
Страница 132: ...130...
Страница 133: ...131...
Страница 135: ...133...
Страница 137: ...135 140 141 142 143 144 145...