97
DHW Priority -
Like all boilers, the Phantom is capable of regulating only one target boiler water temperature at any given
time. This means that priority must be given to either the CH or DHW target temperature. For this reason, the Phantom gives
#!]&&# & %'# ##"!&!] * #
still simultaneous calls for DHW and CH at the end of this time, the boiler will attempt to maintain the target CH temperature
and operate the pump/s needed to satisfy the call for heat. The boiler will once again give priority to the DHW temperature
when either of the following events occur:
Q
The call for CH ends.
Q
The call for DHW is removed and then restored.
Regardless of the DHW option selected, the target water temperature will always change from that for DHW to CH if the
simultaneous demand exceeds 60 min.
4) %#~"#% ##&)&"% $#
allows the user to access rarely needed% $# &;
FACTORY SET -
$# '#% & % $#
used to restore all factory settings if a large number of settings are suspect or if the original control is replaced by one that is
programed for use on another size Phantom. Pressing this button brings up the screen shown in Figure 12.1. Press the model
#& && #&]## #%&\# ' #]##
& && #&\$ ]## #% &#\#' # %
$#&)&"% ###% %#
Section (XII).
"&
"B+>-B)()*)-$
*B(?B)-!*B
)))())+)()*?B-*B(>(*(
)BBB)(BB@B,(-
Содержание PHNTM080
Страница 2: ......
Страница 9: ...7 Figure 4 1 Minimum Clearances To Combustible Construction...
Страница 11: ...9 Figure 5 1 Wall Layout Mounting Hole Location...
Страница 12: ...10 Figure 5 2 Boiler Mounting Bracket Installation Boiler Wall Mounting...
Страница 39: ...37 FIGURE 7 24 SPLIT VENT SYSTEM FLEX IN ABANDONED MASONRY CHIMNEY VENT OPTIONS 33 38...
Страница 63: ...61 This page is intentionally left blank...
Страница 68: ...66 FIGURE 9 2 PIPING METHOD 1 NEAR BOILER PIPING HEATING ONLY...
Страница 69: ...67 FIGURE 9 3A PIPING METHOD 1 NEAR BOILER PIPING HEATING PLUS INDIRECT WATER HEATER IWH OFF PRIMARY LOOP...
Страница 70: ...68 FIGURE 9 3B PIPING METHOD 1 NEAR BOILER PIPING HEATING PLUS INDIRECT WATER HEATER IWH OFF BOILER LOOP...
Страница 72: ...70 FIGURE 9 6 PIPING METHOD 1 NEAR BOILER PIPING SHADED BOILER LOOP...
Страница 80: ...78 FIGURE 10 2 HIGH VOLTAGE PCB TERMINAL CONNECTIONS FIGURE 10 3 LOW VOLTAGE PCB TERMINAL CONNECTIONS...
Страница 82: ...80 FIGURE 10 4 PROPER INSTALLATION OF HEADER SENSOR...
Страница 84: ...82 FIGURE 10 6 INTERNAL WIRING CONNECTIONS DIAGRAM...
Страница 85: ...83...
Страница 92: ...90 Lighting and Operating Instructions...
Страница 98: ...96 FIGURE 12 2 PIPING FOR DHW OPTIONS 1 2 ALSO SEE FIGURES 9 3A 9 3B FIGURE 12 3 PIPING FOR DHW OPTION 3...
Страница 101: ...99 FIGURE 12 5 SETTINGS MENU SEE PART C FOR ADDITIONAL INFORMATION...
Страница 113: ...111 FIGURE 13 2 IGNITION ELECTRODE GAP FIGURE 13 3 CONDENSATE TRAP EXPLODED PARTS VIEW...
Страница 125: ...123...
Страница 127: ...125 40 33 31 27 28 34 35 37 38 32 39 36 29 30 48 Blower Gas Valve Assembly for 80 100 120...
Страница 128: ...126 31 28 27 32 44 42 29 41 45 38 47 30 43 35 46 34 36 33 39 Blower Gas Valve Assembly for 150 180...
Страница 129: ...127...
Страница 131: ...129...
Страница 132: ...130...
Страница 133: ...131...
Страница 135: ...133...
Страница 137: ...135 140 141 142 143 144 145...