3
Table of Contents
I.
Product
Description
4
III.
Before
Installing
5
IV.
Locating
The
Boiler
6
V.
Mounting
The
Boiler
8
VI. Air
For
Ventilation
11
VII. Venting
12
A.
Vent
System
Design
12
B. Design Requirements Unique to Horizontal Twin Pipe
Venting
Systems
18
C. Design Requirements Unique to Vertical Venting Systems
24
D. Design Requirements Unique to Split Vent Systems
32
E. Assembly of CPVC/PVC Vent Systems
39
F. Assembly of DuraVent PolyPro Vent Systems
46
!"#
I. Condensate Trap and Drain
59
J. Removing An Existing Boiler From Common Chimney
60
VIII.
Gas
Piping
62
IX. System
Piping
64
A.
General
System
Piping
Precaution
64
B. Near Boiler Piping Design
65
C.
Standard
Piping
Installation
Requirements
73
D.
Piping
For
Special
Situations
75
X.
Wiring
76
XI. Start-up
and
Checkout
84
XII. Operation
91
XIII. Service and Maintenance
106
XIV. Troubleshooting
113
XV. Parts
121
Appendix A: LP Gas Conversion Instructions
136
Appendix B: Special Requirements For Side-Wall 142
Vented
Appliances
In
The
Commonwealth
of
Massachusetts
Содержание PHNTM080
Страница 2: ......
Страница 9: ...7 Figure 4 1 Minimum Clearances To Combustible Construction...
Страница 11: ...9 Figure 5 1 Wall Layout Mounting Hole Location...
Страница 12: ...10 Figure 5 2 Boiler Mounting Bracket Installation Boiler Wall Mounting...
Страница 39: ...37 FIGURE 7 24 SPLIT VENT SYSTEM FLEX IN ABANDONED MASONRY CHIMNEY VENT OPTIONS 33 38...
Страница 63: ...61 This page is intentionally left blank...
Страница 68: ...66 FIGURE 9 2 PIPING METHOD 1 NEAR BOILER PIPING HEATING ONLY...
Страница 69: ...67 FIGURE 9 3A PIPING METHOD 1 NEAR BOILER PIPING HEATING PLUS INDIRECT WATER HEATER IWH OFF PRIMARY LOOP...
Страница 70: ...68 FIGURE 9 3B PIPING METHOD 1 NEAR BOILER PIPING HEATING PLUS INDIRECT WATER HEATER IWH OFF BOILER LOOP...
Страница 72: ...70 FIGURE 9 6 PIPING METHOD 1 NEAR BOILER PIPING SHADED BOILER LOOP...
Страница 80: ...78 FIGURE 10 2 HIGH VOLTAGE PCB TERMINAL CONNECTIONS FIGURE 10 3 LOW VOLTAGE PCB TERMINAL CONNECTIONS...
Страница 82: ...80 FIGURE 10 4 PROPER INSTALLATION OF HEADER SENSOR...
Страница 84: ...82 FIGURE 10 6 INTERNAL WIRING CONNECTIONS DIAGRAM...
Страница 85: ...83...
Страница 92: ...90 Lighting and Operating Instructions...
Страница 98: ...96 FIGURE 12 2 PIPING FOR DHW OPTIONS 1 2 ALSO SEE FIGURES 9 3A 9 3B FIGURE 12 3 PIPING FOR DHW OPTION 3...
Страница 101: ...99 FIGURE 12 5 SETTINGS MENU SEE PART C FOR ADDITIONAL INFORMATION...
Страница 113: ...111 FIGURE 13 2 IGNITION ELECTRODE GAP FIGURE 13 3 CONDENSATE TRAP EXPLODED PARTS VIEW...
Страница 125: ...123...
Страница 127: ...125 40 33 31 27 28 34 35 37 38 32 39 36 29 30 48 Blower Gas Valve Assembly for 80 100 120...
Страница 128: ...126 31 28 27 32 44 42 29 41 45 38 47 30 43 35 46 34 36 33 39 Blower Gas Valve Assembly for 150 180...
Страница 129: ...127...
Страница 131: ...129...
Страница 132: ...130...
Страница 133: ...131...
Страница 135: ...133...
Страница 137: ...135 140 141 142 143 144 145...