5
$++;
MODEL*
MAXIMUM
INPUT
(MBH)
MINIMUM
INPUT
(MBH)
D.O.E.
HEATING
CAPACITY
(MBH)
AHRI NET
RATING*
(MBH)
WATER
VOLUME
(Gal.)
DIM “A”
SUPPLY &
RETURN
CONNECTION
SIZE (NPT)
GAS
CONNECTION
SIZE (NPT)
APPROX.
NET
WEIGHT
(lb)
PHNTM080
80
16
74
64
0.36
17”
1”
1/2”
100
PHNTM100
100
20
92
80
0.44
17”
1”
1/2”
102
PHNTM120
120
24
111
97
0.53
17”
1”
1/2”
105
PHNTM150
150
30
141
123
0.79
21”
1”
1/2”
119
PHNTM180
180
36
167
145
0.79
21”
1”
1/2”
119
* The Net AHRI Water Ratings shown are based on a piping and pickup allowance of 1.15. The manufacturer should be consulted before
selecting a boiler for installations having unusual piping and pickup requirements, such as intermittent system operation, extensive piping
systems, etc.
Table 2.3: Vent Lengths
MODEL
NOMINAL
VENT/INTAKE
SIZE (in)
MIN VENT
LENGTH (in)
MAX VENT
LENGTH
APPROX.
DERATE AT
MAX VENT
(%)
080
2
12
60ft
9
080
3
12
135ft
2
100
2
12
60ft
15
100
3
12
135ft
3
120
3
12
135ft
7
150
3
52
135ft
7
180
3
52
135ft
9
See Part VII (Venting) for additional requirements and details.
III Before Installing
1) Safe, reliable operation of this boiler depends upon installation by a professional heating contractor in strict accordance
with this manual and the requirements of the authority having jurisdiction.
Q
## #) %[ & \ &' ##
and the National Fuel Gas Code, ANSI Z223.1. In Canada, installation must be in accordance with the B149.1
Installation
Code.
Q
]#( &## #) %[ & \# #
Standard for Controls
and Safety Devices for Automatically Fired Boilers
(ANSI/ASME CSD-1).
2) Read Section VII to verify that the maximum combustion air and exhaust pipe lengths will not be exceeded in the
planned installation. Also verify that the vent terminal can be located in accordance with Section VII.
3) Make sure that the boiler is correctly sized:
Q
^# % %) & _&& `\ && { %
method such as the
I=B=R
Guide RHH published by the Air-Conditioning, Heating and Refrigeration Institute
(AHRI).
Q
^'& # %\#& %| { %% &
Q
^'# # & & '#\# ##&# &
'#|
Содержание PHNTM080
Страница 2: ......
Страница 9: ...7 Figure 4 1 Minimum Clearances To Combustible Construction...
Страница 11: ...9 Figure 5 1 Wall Layout Mounting Hole Location...
Страница 12: ...10 Figure 5 2 Boiler Mounting Bracket Installation Boiler Wall Mounting...
Страница 39: ...37 FIGURE 7 24 SPLIT VENT SYSTEM FLEX IN ABANDONED MASONRY CHIMNEY VENT OPTIONS 33 38...
Страница 63: ...61 This page is intentionally left blank...
Страница 68: ...66 FIGURE 9 2 PIPING METHOD 1 NEAR BOILER PIPING HEATING ONLY...
Страница 69: ...67 FIGURE 9 3A PIPING METHOD 1 NEAR BOILER PIPING HEATING PLUS INDIRECT WATER HEATER IWH OFF PRIMARY LOOP...
Страница 70: ...68 FIGURE 9 3B PIPING METHOD 1 NEAR BOILER PIPING HEATING PLUS INDIRECT WATER HEATER IWH OFF BOILER LOOP...
Страница 72: ...70 FIGURE 9 6 PIPING METHOD 1 NEAR BOILER PIPING SHADED BOILER LOOP...
Страница 80: ...78 FIGURE 10 2 HIGH VOLTAGE PCB TERMINAL CONNECTIONS FIGURE 10 3 LOW VOLTAGE PCB TERMINAL CONNECTIONS...
Страница 82: ...80 FIGURE 10 4 PROPER INSTALLATION OF HEADER SENSOR...
Страница 84: ...82 FIGURE 10 6 INTERNAL WIRING CONNECTIONS DIAGRAM...
Страница 85: ...83...
Страница 92: ...90 Lighting and Operating Instructions...
Страница 98: ...96 FIGURE 12 2 PIPING FOR DHW OPTIONS 1 2 ALSO SEE FIGURES 9 3A 9 3B FIGURE 12 3 PIPING FOR DHW OPTION 3...
Страница 101: ...99 FIGURE 12 5 SETTINGS MENU SEE PART C FOR ADDITIONAL INFORMATION...
Страница 113: ...111 FIGURE 13 2 IGNITION ELECTRODE GAP FIGURE 13 3 CONDENSATE TRAP EXPLODED PARTS VIEW...
Страница 125: ...123...
Страница 127: ...125 40 33 31 27 28 34 35 37 38 32 39 36 29 30 48 Blower Gas Valve Assembly for 80 100 120...
Страница 128: ...126 31 28 27 32 44 42 29 41 45 38 47 30 43 35 46 34 36 33 39 Blower Gas Valve Assembly for 150 180...
Страница 129: ...127...
Страница 131: ...129...
Страница 132: ...130...
Страница 133: ...131...
Страница 135: ...133...
Страница 137: ...135 140 141 142 143 144 145...