35
Table 7.21: Summary of Split Vent System Options (cont.)
31
32
33
34
35
36
37
38
7.22
7.22
7.23, 7.24
7.23, 7.24
7.23, 7.24
7.23, 7.24
7.23, 7.24
7.23, 7.24
Roof
Roof
Roof
Roof
Roof
Roof
Roof
Roof
Wall
Wall
Wall
Wall
Wall
Wall
Wall
Wall
Centrotherm
InnoFlue SW
Centrotherm
InnoFlue SW
DuraVent
PolyPro
(Rigid/Flex)
DuraVent
PolyPro
(Rigid/Flex)
(Rigid/Flex)
(Rigid/Flex)
Centrotherm
(Rigid/Flex)
Centrotherm
(Rigid/Flex)
PVC
PVC
PVC
PVC
PVC
PVC
PVC
PVC
2”
3”
2”
3”
2”
3”
2”
3”
2” or 3”
3”
2” or 3”
3”
2” or 3”
3”
2” or 3”
3”
Min Equivalent Vent Length:
48”
48”
48”
48”
48”
48”
48”
48”
48”
48”
48”
48”
48”
48”
48”
48”
48”
48”
48”
48”
52”
52”
52”
52”
52”
52”
52”
52”
Max Equivalent Vent Length (Note 1):
60ft
135ft
60ft
135ft
60ft
135ft
60ft
135ft
60ft
135ft
60ft
135ft
60ft
135ft
60ft
135ft
135ft
135ft
135ft
135ft
135ft
135ft
135ft
135ft
135ft
135ft
135ft
135ft
ISEP02 or
ISEP0239 w
Screen
ISEP03 or
ISEP0339 w
Screen
90 Elbow w
Screen
90 Elbow w
Screen
2PPS-FK
2PPS-FLEX**
3PPS-FK
3PPS-FLEX**
2PF-FLEX-KIT
2PF-FLEX
3PF-FLEX-KIT
3PF-FLEX
IFCK02**
IFCK03**
90 Elbow w
Screen
90 Elbow w
Screen
90 Elbow w
Screen
90 Elbow w
Screen
90 Elbow w
Screen
90 Elbow w
Screen
2PPS-VFT
2PPS-BF*
2PPS-FLEX**
3PPS-VFT
3PPS-BF*
3PPS-FLEX**
2PF-10UV or
2PF-39UV w
Screen
2PF-BVSC
(Note 4)
3PF-10UV or
3PF-39UV w
Screen
3PF-BVSC
(Note 4)
IFBK02****
IFBK03****
90 Elbow w
Screen
90 Elbow w
Screen
90 Elbow w
Screen
90 Elbow w
Screen
90 Elbow w
Screen
90 Elbow w
Screen
Содержание PHNTM080
Страница 2: ......
Страница 9: ...7 Figure 4 1 Minimum Clearances To Combustible Construction...
Страница 11: ...9 Figure 5 1 Wall Layout Mounting Hole Location...
Страница 12: ...10 Figure 5 2 Boiler Mounting Bracket Installation Boiler Wall Mounting...
Страница 39: ...37 FIGURE 7 24 SPLIT VENT SYSTEM FLEX IN ABANDONED MASONRY CHIMNEY VENT OPTIONS 33 38...
Страница 63: ...61 This page is intentionally left blank...
Страница 68: ...66 FIGURE 9 2 PIPING METHOD 1 NEAR BOILER PIPING HEATING ONLY...
Страница 69: ...67 FIGURE 9 3A PIPING METHOD 1 NEAR BOILER PIPING HEATING PLUS INDIRECT WATER HEATER IWH OFF PRIMARY LOOP...
Страница 70: ...68 FIGURE 9 3B PIPING METHOD 1 NEAR BOILER PIPING HEATING PLUS INDIRECT WATER HEATER IWH OFF BOILER LOOP...
Страница 72: ...70 FIGURE 9 6 PIPING METHOD 1 NEAR BOILER PIPING SHADED BOILER LOOP...
Страница 80: ...78 FIGURE 10 2 HIGH VOLTAGE PCB TERMINAL CONNECTIONS FIGURE 10 3 LOW VOLTAGE PCB TERMINAL CONNECTIONS...
Страница 82: ...80 FIGURE 10 4 PROPER INSTALLATION OF HEADER SENSOR...
Страница 84: ...82 FIGURE 10 6 INTERNAL WIRING CONNECTIONS DIAGRAM...
Страница 85: ...83...
Страница 92: ...90 Lighting and Operating Instructions...
Страница 98: ...96 FIGURE 12 2 PIPING FOR DHW OPTIONS 1 2 ALSO SEE FIGURES 9 3A 9 3B FIGURE 12 3 PIPING FOR DHW OPTION 3...
Страница 101: ...99 FIGURE 12 5 SETTINGS MENU SEE PART C FOR ADDITIONAL INFORMATION...
Страница 113: ...111 FIGURE 13 2 IGNITION ELECTRODE GAP FIGURE 13 3 CONDENSATE TRAP EXPLODED PARTS VIEW...
Страница 125: ...123...
Страница 127: ...125 40 33 31 27 28 34 35 37 38 32 39 36 29 30 48 Blower Gas Valve Assembly for 80 100 120...
Страница 128: ...126 31 28 27 32 44 42 29 41 45 38 47 30 43 35 46 34 36 33 39 Blower Gas Valve Assembly for 150 180...
Страница 129: ...127...
Страница 131: ...129...
Страница 132: ...130...
Страница 133: ...131...
Страница 135: ...133...
Страница 137: ...135 140 141 142 143 144 145...