76
"&
%A((B?*)B
A)B**(-#F(
*+?BFB?(-
X Wiring
"&
z
"?()(*?(A,(
@*(D()@?<%"Y6J-
@?()(*?
@%4I"::-4J-
z
(BB?*)((B
)-
z
B?)*(BB))(-.F(B?
*)B?F-
z
*)(*B?BB>A(A-
z
A,()B()FBAB-
z
!?))(B(B-*
BB??)-&)
?)(?*-&@(??
((BB?-
$!
!*D(BB??)B()(-!)BA
*(?A*?)B(+B)
-#D(?)B()-@
?)B()(?#;66Z"D(-
(46-9-
^ %#'# ### %#)%&')% & &' # &
' %$#"|\)##'&#' %)&# #
cover.
1) Line Voltage (120 VAC) Field Connections – See Figure 10.2 for line voltage connections. Provide a dedicated circuit for the
boiler of 15A or greater. A service switch is recommended and is required by many local codes. Locate this switch in accor-
dance with local codes or, in the absence of any, in a location where it can be safely accessed in an emergency involving the
boiler. All 120VAC connections to the boiler itself are made on the terminal strip on the high voltage PCB located on the left
side if the wiring compartment. From top to bottom, the connections on the terminal strip are:
Q
120VAC Hot
Q
120VAC Neutral
Q
Ground
Q
System Pump Hot
Q
System Pump Neutral
Q
DHW Pump Hot
Q
DHW Pump Neutral
Содержание PHNTM080
Страница 2: ......
Страница 9: ...7 Figure 4 1 Minimum Clearances To Combustible Construction...
Страница 11: ...9 Figure 5 1 Wall Layout Mounting Hole Location...
Страница 12: ...10 Figure 5 2 Boiler Mounting Bracket Installation Boiler Wall Mounting...
Страница 39: ...37 FIGURE 7 24 SPLIT VENT SYSTEM FLEX IN ABANDONED MASONRY CHIMNEY VENT OPTIONS 33 38...
Страница 63: ...61 This page is intentionally left blank...
Страница 68: ...66 FIGURE 9 2 PIPING METHOD 1 NEAR BOILER PIPING HEATING ONLY...
Страница 69: ...67 FIGURE 9 3A PIPING METHOD 1 NEAR BOILER PIPING HEATING PLUS INDIRECT WATER HEATER IWH OFF PRIMARY LOOP...
Страница 70: ...68 FIGURE 9 3B PIPING METHOD 1 NEAR BOILER PIPING HEATING PLUS INDIRECT WATER HEATER IWH OFF BOILER LOOP...
Страница 72: ...70 FIGURE 9 6 PIPING METHOD 1 NEAR BOILER PIPING SHADED BOILER LOOP...
Страница 80: ...78 FIGURE 10 2 HIGH VOLTAGE PCB TERMINAL CONNECTIONS FIGURE 10 3 LOW VOLTAGE PCB TERMINAL CONNECTIONS...
Страница 82: ...80 FIGURE 10 4 PROPER INSTALLATION OF HEADER SENSOR...
Страница 84: ...82 FIGURE 10 6 INTERNAL WIRING CONNECTIONS DIAGRAM...
Страница 85: ...83...
Страница 92: ...90 Lighting and Operating Instructions...
Страница 98: ...96 FIGURE 12 2 PIPING FOR DHW OPTIONS 1 2 ALSO SEE FIGURES 9 3A 9 3B FIGURE 12 3 PIPING FOR DHW OPTION 3...
Страница 101: ...99 FIGURE 12 5 SETTINGS MENU SEE PART C FOR ADDITIONAL INFORMATION...
Страница 113: ...111 FIGURE 13 2 IGNITION ELECTRODE GAP FIGURE 13 3 CONDENSATE TRAP EXPLODED PARTS VIEW...
Страница 125: ...123...
Страница 127: ...125 40 33 31 27 28 34 35 37 38 32 39 36 29 30 48 Blower Gas Valve Assembly for 80 100 120...
Страница 128: ...126 31 28 27 32 44 42 29 41 45 38 47 30 43 35 46 34 36 33 39 Blower Gas Valve Assembly for 150 180...
Страница 129: ...127...
Страница 131: ...129...
Страница 132: ...130...
Страница 133: ...131...
Страница 135: ...133...
Страница 137: ...135 140 141 142 143 144 145...