113
XIV. Troubleshooting
The following pages contain trouble shooting tables for use in diagnosing control problems. When using these tables
the following should be kept in mind:
1) This information is only meant to be used by a professional heating technician as an aid in diagnosing boiler
problems.
2) Where applicable, follow all precautions outlined in the Section XI (Start-up and Checkout).
3) All controls on the boiler are tested at least once in the manufacturing process and a defective control or
component is generally the least likely cause. Before replacing a component, try to rule out all other possible causes.
A. Using the Diagnostics Menu
The plain text display provided with this boiler provides an easy means of identifying most common problems. In the event that
the control system detects a problem, such as an open limit or defective sensor, the Active Fault button shown in Figure 14.0 will
&###!&#$# % # )^' #
# % ^#\## %# )# #
of a defective temperature sensor, a defect indicator will also show up on the status screens where the corresponding temperature
is normally displayed. See Figure 14.0 for an example of this.
The complete Diagnostics Menu is shown in Figure 12.7. The screens on this menu provide the following information:
1) For Service Contact
- Displays the service contact information entered in Section XII, Step D.
2) About
- Displays the software versions for both the boiler control (R7910B) and the display
3) Fault
Menu
- Provides status of different types of faults by category. When a particular fault exists, the button for that
%' #_^ %*`#*#' ^ %
\##&}##^& )
lockout. Fault categories include:
"&
0
+B>-F>-(>-!*(C))*@
A@)AB@A?(B(-"(
B?(BB?)B(*)B
)*A-
0
)BA?FBA*-A)@
)A)B?A-
"&
0
!*)(*AB*F+BA-
0
B@)(*B?)-
0
&@(?(?
)(-
0
?(A@*?(
?BB-
0
A,()B(*BB)B*-
0
&@(?(?"##)B
()(-
0
"(B)BBBB*B
**FA-
Содержание PHNTM080
Страница 2: ......
Страница 9: ...7 Figure 4 1 Minimum Clearances To Combustible Construction...
Страница 11: ...9 Figure 5 1 Wall Layout Mounting Hole Location...
Страница 12: ...10 Figure 5 2 Boiler Mounting Bracket Installation Boiler Wall Mounting...
Страница 39: ...37 FIGURE 7 24 SPLIT VENT SYSTEM FLEX IN ABANDONED MASONRY CHIMNEY VENT OPTIONS 33 38...
Страница 63: ...61 This page is intentionally left blank...
Страница 68: ...66 FIGURE 9 2 PIPING METHOD 1 NEAR BOILER PIPING HEATING ONLY...
Страница 69: ...67 FIGURE 9 3A PIPING METHOD 1 NEAR BOILER PIPING HEATING PLUS INDIRECT WATER HEATER IWH OFF PRIMARY LOOP...
Страница 70: ...68 FIGURE 9 3B PIPING METHOD 1 NEAR BOILER PIPING HEATING PLUS INDIRECT WATER HEATER IWH OFF BOILER LOOP...
Страница 72: ...70 FIGURE 9 6 PIPING METHOD 1 NEAR BOILER PIPING SHADED BOILER LOOP...
Страница 80: ...78 FIGURE 10 2 HIGH VOLTAGE PCB TERMINAL CONNECTIONS FIGURE 10 3 LOW VOLTAGE PCB TERMINAL CONNECTIONS...
Страница 82: ...80 FIGURE 10 4 PROPER INSTALLATION OF HEADER SENSOR...
Страница 84: ...82 FIGURE 10 6 INTERNAL WIRING CONNECTIONS DIAGRAM...
Страница 85: ...83...
Страница 92: ...90 Lighting and Operating Instructions...
Страница 98: ...96 FIGURE 12 2 PIPING FOR DHW OPTIONS 1 2 ALSO SEE FIGURES 9 3A 9 3B FIGURE 12 3 PIPING FOR DHW OPTION 3...
Страница 101: ...99 FIGURE 12 5 SETTINGS MENU SEE PART C FOR ADDITIONAL INFORMATION...
Страница 113: ...111 FIGURE 13 2 IGNITION ELECTRODE GAP FIGURE 13 3 CONDENSATE TRAP EXPLODED PARTS VIEW...
Страница 125: ...123...
Страница 127: ...125 40 33 31 27 28 34 35 37 38 32 39 36 29 30 48 Blower Gas Valve Assembly for 80 100 120...
Страница 128: ...126 31 28 27 32 44 42 29 41 45 38 47 30 43 35 46 34 36 33 39 Blower Gas Valve Assembly for 150 180...
Страница 129: ...127...
Страница 131: ...129...
Страница 132: ...130...
Страница 133: ...131...
Страница 135: ...133...
Страница 137: ...135 140 141 142 143 144 145...