background image

CONTENTS ......................................................................PAGE

Ratings and Dimensions .............................................................2
Installation Requirements:

Boiler Location..........................................................................3
Clearances ............................................................................3-4
Vent Requirements ...................................................................3
Vent Piping ...............................................................................3
Installing Water trim..................................................................3
Installing Burner .......................................................................5
Oil Supply Piping......................................................................6

Wiring the Boiler ..........................................................................6
Operating Instructions:

Precautions Before Starting .....................................................6
Start-up .....................................................................................6
Cleaning and Filling New Water Boiler ....................................6
Wiring Diagrams....................................................................7-9

Burner Data:

Riello..................................................................................10-11

Care and Maintenance:

Extended Shutdown...............................................................12
Freezing Protection ................................................................12
Oil Burner................................................................................12
General Maintenance .............................................................12

Appendix A–G  .....................................................................13-15

SAFETY WARNING:

KEEP BOILER AREA CLEAR AND FREE FROM 
COMBUSTIBLE MATERIALS, GASOLINE AND 
OTHER FLAMMABLE VAPORS AND LIQUIDS. 
FAILURE TO ADHERE TO ABOVE SAFETY
WARNING, MAY RESULT IN PERSONAL INJURY 
OR DEATH AND PROPERTY DAMAGE.

IMPORTANT: 

The installation of this equipment must

conform to the requirements of the authority having juris-
diction or, in the absence of such requirements, to the
Installation of Oil Burning Equipment, CSA B139, latest
edition. The installation must also conform to the addi-
tional requirements in this Slant/Fin Instruction Manual.
Where there is any difference, the more stringent require-
ment shall govern.

In addition, where required by the authority having juris -
dic tion, the installation must conform to American Society
of Mechanical Engineers Safety Code for Controls and
Safety Devices for Automatically Fired Boilers, No. CSD-1
or CSA B149.1-00 for natural gas and propane. If there is
any conflict in the above requirements, then the more
stringent requirement will apply.

THIS MANUAL MUST BE LEFT WITH OWNER AND

SHOULD BE HUNG ON OR ADJACENT TO THE

BOILER FOR REFERENCE.

IMPORTANT:  This boiler must be installed by a trained, 
experienced, service technician, licensed for the installation
and servicing of oil burning equipment or otherwise qualified by
the authorities having jurisdiction over the installation.

Part No. 470908000  Publication No. EC-10DV-40

Printed in Canada 0610

Rev. A

DIRECT VENT OIL-FIRED WATER BOILER/NO. 2 OIL

INSTALLATION AND OPERATING INSTRUCTIONS

EUTECTIC 

EC-10DV Series

SERVICE COMPANY

Name _______________________________________________

Address _____________________________________________

_____________________________________________________

Telephone____________________________________________

Model # _____________________________________________

Serial # ______________________________________________

Содержание EUTECTICEC-15DV

Страница 1: ...the more stringent require ment shall govern In addition where required by the authority having juris diction the installation must conform to American Society of Mechanical Engineers Safety Code for...

Страница 2: ...Department of Energy D O E Test Procedures for Boil ers TABLE 1 Ratings and Dimensions Figure 1 Dimensions Boiler Model No OIL INPUT GROSS OUTPUT NET OUT PUT DIMENSIONS APPROX OVERALL LENGTH A BOILER...

Страница 3: ...minate vent under decks stairways or car ports When ever possible locations under windows should be avoided Vent termination should not be mounted directly above or within 914mm 3 feet horizontally fr...

Страница 4: ...be left clear around the boiler Do not stack items on or box in the appliance within the required clearances to combustibles The figures stated in metric inches in the drawing below are the minimum re...

Страница 5: ...See Burner Data pages 9 10 and Burner Manual supplied with burner If burner is not mounted as received mount to boiler placing flange over mounting studs Use gasket between flange and boiler Distance...

Страница 6: ...and air supply pipe are properly installed and clear of obstruction Note Neither overfire nor flue draft should exceed 8 9mm 0 35 WC during burner operation THE FLUE IS UNDER POSITIVE PRESSURE DURING...

Страница 7: ...EUTECTIC EC 10 DV 7 Honeywell L7248L Control...

Страница 8: ...EUTECTIC EC 10 DV 8 Honeywell L7248L with SF 10 Control...

Страница 9: ...of interest For example press I High Limit HL is displayed followed by a three digit number i e 220 followed by F or C Pressing the I button again on L7224 models will display the Low Limit LL followe...

Страница 10: ...2 4 2 none 107 95 4 25 EUTECTIC EC 10 DV 10 Models BF 3 BF 5 Electrode Setting Turbulator location Picture 1 TURBULATOR SETTING 1 Loosen nut 1 then turn the screw 2 until the index marker 3 is aligne...

Страница 11: ...r to increase combustion air turn the screw clockwise indicator to decrease combustion air 3 The final position of the air damper will vary on each installation Use instruments to establish the proper...

Страница 12: ...oped in the combustion chamber Vacuum the loose soot and debris from the boiler Clean and replace baffle plates Inspect the burner combustion head Clean if necessary and make sure all the adjustments...

Страница 13: ...approximately 54 degrees Celsius 130 degrees Fahrenheit most of the flow will be through the system Mounting TV can be installed in any position An adjustable balancing valve or ball valve must be ins...

Страница 14: ...d by local codes If the boiler is installed above the radiation level a low water cut off device must be installed in all instances Do not install an isolation valve between the boiler and the low wat...

Страница 15: ...er hinges 2 You may have to loosen the cast iron hinge pin 3 to facilitate removal of the lower hinge 3 Remove the cast iron hinge pin 3 which is attached by two 13 mm bolts 4 4 Re install the two bol...

Страница 16: ...Fin Corp 2008 SLANT FIN LTD LTEE 6450 Northam Drive Mississauga Ontario L4V 1H9 Phone 905 677 8400 FAX 905 677 1829 Order Desk Fax 905 677 9015 www slantcan ca E mail orderdesk slantfin ca info slant...

Отзывы: