I nst alling ant ennas and ODUs
Chapt er 5: I nst allat ion
5- 20
phn- 2513_004v000 ( Oct 2012)
5
Use the four screws supplied in the kit to fit the flexible waveguide to the tapered
transition. It makes taping the joint easier if the four screws are inserted in the
direction shown.
6
Use FT-TB fusion tape (Andrews part FT-TB) to water proof the junctions as shown.
Installing a direct mount antenna with two ODUs (via coupler)
In the direct mount configuration, attach the coupler (with ODUs) directly to the antenna
(with Cambium ODU interface) via four latches.
If the coupler is asymmetric, one side is embossed with the word ‘MAIN’ and the other
side with ‘STANDBY’ (
). The ‘MAIN’ side has lower loss. Ensure that the ‘MAIN’
and ‘STANDBY’ sides can still be identified after the ODUs are fitted, as this allows them
to be connected to the correct CMUs.
Содержание PTP 800 Series
Страница 1: ...Cambium PTP 800 Series User Guide System Release 800 05 02 ...
Страница 40: ...Licensing requirements About This User Guide 10 phn 2513_004v000 Oct 2012 ...
Страница 232: ...Limit of liability Chapter 3 Legal information 3 22 phn 2513_004v000 Oct 2012 ...
Страница 322: ...Radiation hazard assessm ent Chapter 4 Reference information 4 90 phn 2513_004v000 Oct 2012 ...
Страница 418: ...Replacing IRFU components Chapter 5 Installation 5 96 phn 2513_004v000 Oct 2012 Figure 1 1 0 IRFU components example ...
Страница 428: ...Replacing IRFU components Chapter 5 Installation 5 106 phn 2513_004v000 Oct 2012 ...
Страница 552: ...Configuring for FIPS 140 2 applications Chapter 6 Configuration and alignment 6 124 phn 2513_004v000 Oct 2012 ...
Страница 630: ...Using recovery mode Chapter 7 Operation 7 78 phn 2513_004v000 Oct 2012 ...
Страница 648: ...Glossary I V phn 2513_004v000 Oct 2012 ...