R5905948 /12
Event Master Devices
49
Product
Contains
Accessories included
•
2x 61100005
•
Desk Light
•
1x R9080004
•
Dust Cover
•
07-1205500-00
•
USB Thumb Drive (Contains Users Guide, System Software and
Control GUI)
•
R5906018
•
Safety manual
•
26
–
1701004
–
00
•
Quick Start Guide
Mechanical check
This check should confirm that there are no broken parts and the unit is free of dents or scratches. Your Barco
Sales representative should be notified as soon as possible if this is not the case.
3.9 Rack-Mount Procedure
General
The chassis of the Event master devices (E2, S3 series, and EX) are designed to be rack mounted. The
devices are supplied with front rackmount hardware.
Please note the following important points:
•
The E2 is 4RU in height, the S3 is 3RU in height, and the EX is 1RU in height.
•
The maximum ambient operating temperature is 40° C.
Note:
the maximum ambient operating temperature for EC-200/EC-210 is 35° C.
•
Leave sufficient front and rear space to ensure that airflow through the unit is not restricted.
•
When installing equipment into a rack, distribute the units evenly to prevent hazardous conditions that may
be created by uneven weight distribution.
•
Connect the unit only to a properly rated supply circuit.
•
Reliable grounding (earthing) of rack-mounted equipment should be maintained.
•
Rack mount the unit from the front rack ears using four rack screws (not supplied). Threads may be metric
or otherwise, depending upon the rack type.
Rack-mount procedure is different depending the Event master device type (E2 or S3).
CAUTION:
At a minimum, an E2 chassis weighs 31 kg (68 lbs) and a S3 chassis weighs 24 kg (53
lbs). To avoid injury, it is recommended that two people rack mount these chassis.
How to install E2 in a rack
Use the following steps to rack mount the E2:
1.
The E2 is shipped with side rails included in the shipping case and not installed onto the chassis. These side
rails, when they are properly installed and adjusted, assist with the distribution of chassis (and cable) weight
within your rack. Use the following steps to properly adjust the side rails:
1.
Measure and install the two supplied mounting brackets on your rear rack rails.
Image 3-12
Содержание Event Master E2 Series
Страница 1: ...ENABLING BRIGHT OUTCOMES User s Guide Event Master Devices...
Страница 12: ...R5905948 12 Event Master Devices 12...
Страница 24: ...R5905948 12 Event Master Devices 24 Safety...
Страница 52: ...R5905948 12 Event Master Devices 52 General...
Страница 82: ...R5905948 12 Event Master Devices 82 Hardware orientation...
Страница 102: ...R5905948 12 Event Master Devices 102 Front Panel Menu orientation...
Страница 272: ...R5905948 12 Event Master Devices 272 Image 6 137 EM GUI orientation...
Страница 304: ...R5905948 12 Event Master Devices 304 Updating firmware...
Страница 326: ...R5905948 12 Event Master Devices 326 Image 9 28 General operation example...
Страница 382: ...R5905948 12 Event Master Devices 382 Preventive maintenance actions...
Страница 386: ...R5905948 12 Event Master Devices 386 14 2 Process Overview Flow chart Image 14 2 E2 Maintenance...
Страница 444: ...R5905948 12 Event Master Devices 444 E2 Maintenance...
Страница 448: ...R5905948 12 Event Master Devices 448 15 2 Process Overview Flow chart Image 15 2 S3 Maintenance...
Страница 528: ...R5905948 12 Event Master Devices 528 EC 200 EC 210 Maintenance...
Страница 569: ...569 R5905948 12 Event Master Devices Troubleshooting C...
Страница 572: ...R5905948 12 Event Master Devices 572 Troubleshooting...
Страница 583: ...R5905948 12 Event Master Devices 583 Index...