
298
DSView Installer/User Guide
The SPC device socket will power down and the icon for the SPC device socket in the content
area will change.
To cycle the power of an SPC device socket:
1.
From the side navigation bar, select
Power
. A list of SPC device sockets attached to the switch
will appear in the content area.
2.
Select an SPC device socket that is powered up and select
Tools - Cycle Power
from the
menu bar.
-or-
Select an SPC device socket that is powered up and click the
Cycle Power
toolbar button.
-or-
Right-click on an SPC device socket that is powered up and select
Cycle Power
from the
shortcut menu.
The SPC device socket is powered down, then powered up and the icon for the SPC device
socket in the content area will change accordingly.
Displaying switch version information
To display switch version information:
From the menu bar, select
View - Versions.
-or-
From the side navigation bar, click
Version
. The versions of the following items will appear in the
content area:
•
Application
•
Boot
•
Digital/Application
•
Digital/Hardware
•
Hardware
To refresh the Versions view:
From the menu bar when the Versions view is displayed, select
View - Refresh
.
Exiting DSR Remote Operations
To exit DSR remote operations:
From the menu bar, select
File - Exit
.
Содержание DSView
Страница 4: ......
Страница 12: ...x DSView Installer User Guide ...
Страница 18: ...xvi DSView Installer User Guide ...
Страница 50: ...32 DSView Installer User Guide ...
Страница 90: ...72 DSView Installer User Guide ...
Страница 154: ...136 DSView Installer User Guide ...
Страница 210: ...192 DSView Installer User Guide ...
Страница 232: ...214 DSView Installer User Guide ...
Страница 248: ...230 DSView Installer User Guide ...
Страница 357: ......