Table of Contents
5.3
Dual-circuit pneumatic service braking system ..................................................................... 61
5.3.1
Coupling the brake and supply lines ..................................................................................... 62
5.3.2
Uncoupling the brake and supply lines ................................................................................. 63
5.4
Hydraulic operating brake system ......................................................................................... 64
5.4.1
Coupling the hydraulic operating brake system .................................................................... 64
5.4.2
Uncoupling the hydraulic operating brake system ................................................................ 64
5.5
Operator control terminal AMATRON 3 ................................................................................ 65
5.6
Roller holder .......................................................................................................................... 67
5.7
Seed hopper .......................................................................................................................... 67
5.7.1
Digital fill level monitoring (optional) ..................................................................................... 68
5.8
Seed dosing .......................................................................................................................... 69
5.8.1
Table: Dosing rollers ............................................................................................................. 70
5.8.2
Table Seed dosing rollers ..................................................................................................... 71
5.8.3
Seed rate adjustment with full dosing (optional) ................................................................... 72
5.8.4
Increasing sowing rate, coulter pressure and harrow pressure ............................................ 74
5.9
Blower fan ............................................................................................................................. 75
5.9.1
Connecting the blower fan to the tractor hydraulics .............................................................. 76
5.9.2
Connecting the blower fan to the tractor's universal joint shaft ............................................. 77
5.10
Distributor head ..................................................................................................................... 78
5.11
Radar ..................................................................................................................................... 78
5.12
Tapered ring tyres ................................................................................................................. 79
5.13
Seed planting ........................................................................................................................ 79
5.13.1
RoTeC and RoTeC+ coulter.................................................................................................. 80
5.13.2
Coulter pressure .................................................................................................................... 81
5.14
Exact harrow ......................................................................................................................... 82
5.15
Roller harrow (optional) ......................................................................................................... 83
5.16
Two-row disc array ................................................................................................................ 83
5.17
Track loosener (optional) ...................................................................................................... 84
5.18
Markers ................................................................................................................................. 85
5.19
Creation of tramlines ............................................................................................................. 86
5.19.1
Examples for creating tramlines ............................................................................................ 88
5.19.2
Tramline rhythm 4, 6 and 8 ................................................................................................... 90
5.19.3
Tramline rhythm 2 plus and 6 plus ........................................................................................ 91
5.19.4
Half-sided switching off (part width) ...................................................................................... 92
5.19.5
Tramline marker (option) ....................................................................................................... 92
6
Commissioning ......................................................................................... 93
6.1
Checking the suitability of the tractor .................................................................................... 94
6.1.1
Calculating the actual values for the total tractor weight, tractor axle loads and load
capacities, as well as the minimum ballast ........................................................................... 95
6.1.1.1
Data required for the calculation (hitched machine) ............................................................. 96
6.1.1.2
Calculation of the required minimum ballasting at the front G
V min
of the tractor for assurance
of the steering capability ....................................................................................................... 97
6.1.1.3
Calculation of the actual front axle load of the tractor T
V tat
................................................... 97
6.1.1.4
Calculation of the actual total weight of the combined tractor and machine ......................... 97
6.1.1.5
Calculation of the actual rear axle load of the tractor T
H tat
................................................... 97
6.1.1.6
Tyre load capacity ................................................................................................................. 97
6.1.1.7
Table...................................................................................................................................... 98
6.1.2
Requirements for tractor operation with attached machines................................................. 99
6.1.3
Machines without their own brake system ............................................................................ 99
6.2
Securing the tractor / machine against unintentional start-up and rolling ........................... 100
6.3
Installation regulations for the hydraulic fan drive connection ............................................ 101
6.4
Initial installation of the AMATRON 3 .................................................................................. 102
7
Coupling and uncoupling the machine ................................................. 103
7.1
Coupling the machine.......................................................................................................... 103
7.1.1
Hydraulic connections ......................................................................................................... 108
7.1.2
Connecting the electrical connections ................................................................................. 109
6
Cirrus BAH0049-1 09.14
Содержание Cirrus 3002
Страница 28: ...General Safety Instructions Fig 3 Fig 4 Fig 5 Fig 6 Fig 7 Fig 8 Fig 9 Fig 10 28 Cirrus BAH0049 1 09 14...
Страница 89: ...Structure and function Fig 95 Cirrus BAH0049 1 09 14 89...
Страница 136: ...Settings 8 10 1 136 Cirrus BAH0049 1 09 14...
Страница 206: ...Hydraulic system diagrams Fig 224 206 Cirrus BAH0049 1 09 14...
Страница 208: ...Hydraulic system diagrams Fig 225 208 Cirrus BAH0049 1 09 14...