
260
Solvent Vapor Exit Accessory
Replacement procedures
6 of 10
Jun 2001
Agilent 6890 Gas Chromatograph Service Manual
Replacing the pre-column assembly
1.
Cool the inlet and detector.
2.
Turn inlet and detector gases off.
3.
Disconnect the Tri-column assembly from the COC inlet, the detector and
the (SS) union and remove the column assembly from the GC oven.
4.
Using a column cutter, cut the transfer column and the analytical columns
as close to the quartz Y-splitter as possible. Be sure to cut the columns
straight.
5.
Using the column cutter, trim the ends of the tri-column assembly
ensuring that the cuts are straight. Then use a lint free wipe and methanol
to clean any dirt and finger prints from approximately three to four
centimeters from each of the five column ends.
6.
Being careful not to touch the ends of the columns, insert them into the
quartz splitter as far as possible, making sure that the column ends are
making contact with the inside walls of the splitter. Sufficient pressure
should be applied to give a good seal. Too much pressure, on the other
hand, can damage the polyimide layer or even the column and result in
leakage. Test to see that the column has been installed correctly by trying
to pull the column out of the splitter using medium force. If the column
comes out easily, trim the end and insert again.
Note
A concentric circle inside the splitter should result if the column is installed
correctly.
7.
After connecting the column ends into the quartz splitter, reconnect the
tri-column assembly inside the GC oven and increase the column head
pressure incrementally to the desired pressure. An incremental increase
is better than immediately applying the total column head pressure to
avoid a “shock” that can loosen the connection.
Содержание 6890 Series
Страница 1: ...6890 Series Gas Chromatograph Service Manual ...
Страница 2: ...6890 Series Gas Chromatograph Service Manual ...
Страница 27: ...24 of 24 Jun 2001 Contents Contents Agilent 6890 Gas Chromatograph Service Manual ...
Страница 29: ......
Страница 39: ......
Страница 195: ...260 Solvent Vapor Exit Accessory Leak testing 10 of 10 Jun 2001 Inlets Agilent 6890 Gas Chromatograph Service Manual ...
Страница 207: ......
Страница 389: ...360 Auxiliary EPC Replacement procedures 16 of 16 Jun 2001 Detectors Agilent 6890 Gas Chromatograph Service Manual ...
Страница 391: ......
Страница 459: ......
Страница 479: ...520 Gases Supplying valve actuator air 14 of 14 Jun 2001 Site Preparation Agilent 6890 Gas Chromatograph Service Manual ...
Страница 485: ...530 Power Grounding 6 of 6 Jun 2001 Site Preparation Agilent 6890 Gas Chromatograph Service Manual ...
Страница 491: ...540 Instrument Specifications Detectors 6 of 6 Jun 2001 Site Preparation Agilent 6890 Gas Chromatograph Service Manual ...
Страница 492: ...600 Performance Verification How to check the performance of the 6890 instrument 610 Checkout Chromatograms ...
Страница 493: ......
Страница 521: ......
Страница 523: ......
Страница 555: ...840 Shutdowns 10 of 10 Jun 2001 Error Codes and Internal Diagnostics Agilent 6890 Gas Chromatograph Service Manual ...
Страница 580: ...900 Remote Access Remote Access information was not available for this printing ...
Страница 581: ......
Страница 583: ......
Страница 631: ......
Страница 637: ...1110 Valves Liquid sample valves 6 of 6 Jun 2001 Valves Agilent 6890 Gas Chromatograph Service Manual ...
Страница 647: ...1120 Valve Box Removing the valve box assembly 10 of 10 Jun 2001 Valves Agilent 6890 Gas Chromatograph Service Manual ...
Страница 675: ...1150 Troubleshooting Pressure check 6 of 6 Jun 2001 Valves Agilent 6890 Gas Chromatograph Service Manual ...
Страница 677: ......
Страница 717: ...1225 Main Board 6890N Fuses 6 of 6 Jun 2001 Electrical Agilent 6890 Gas Chromatograph Service Manual ...
Страница 737: ......