
23 of 30
Jun 2001
Agilent 6890 Gas Chromatograph Service Manual
Volatiles Interface
250
Leak testing the volatiles interface
1.
Use the leak detector to check the plumbing lines for leaks. Check each
fitting, including the gang fitting and the filter trap assembly. If a leak is
found, correct it and check the performance of the GC. If the problem is
not solved, continue with the leak test.
2.
Cool the oven to room temperature and then turn it off.
3.
When the oven is cool, turn off the interface pressure from the keyboard.
4.
Remove the column, if one is installed, and plug the column fitting with
the column nut and a no-hole ferrule.
5.
Cap the septum purge and split vent fittings located on the flow module
with 1/8-inch Swagelok caps.
6.
Enter a pressure setpoint between 20 and 25 psi, or enter the normal
operating pressure if it is greater. Make sure that the pressure at the
initial gas supply is at least 10 psi higher than the interface pressure.
Wait a few minutes for the pressure to equilibrate.
7.
Turn the pressure off from the inlet control table. Because the septum
purge, split vent, and column fittings are capped, gas should be trapped
in the system and the pressure should remain fairly constant. If desired,
turn the pressure off at the source to isolate the pneumatic system
completely.
Enter a pressure
setpoint
Press
[Front interface
]
or
[Back interface
]
Содержание 6890 Series
Страница 1: ...6890 Series Gas Chromatograph Service Manual ...
Страница 2: ...6890 Series Gas Chromatograph Service Manual ...
Страница 27: ...24 of 24 Jun 2001 Contents Contents Agilent 6890 Gas Chromatograph Service Manual ...
Страница 29: ......
Страница 39: ......
Страница 195: ...260 Solvent Vapor Exit Accessory Leak testing 10 of 10 Jun 2001 Inlets Agilent 6890 Gas Chromatograph Service Manual ...
Страница 207: ......
Страница 389: ...360 Auxiliary EPC Replacement procedures 16 of 16 Jun 2001 Detectors Agilent 6890 Gas Chromatograph Service Manual ...
Страница 391: ......
Страница 459: ......
Страница 479: ...520 Gases Supplying valve actuator air 14 of 14 Jun 2001 Site Preparation Agilent 6890 Gas Chromatograph Service Manual ...
Страница 485: ...530 Power Grounding 6 of 6 Jun 2001 Site Preparation Agilent 6890 Gas Chromatograph Service Manual ...
Страница 491: ...540 Instrument Specifications Detectors 6 of 6 Jun 2001 Site Preparation Agilent 6890 Gas Chromatograph Service Manual ...
Страница 492: ...600 Performance Verification How to check the performance of the 6890 instrument 610 Checkout Chromatograms ...
Страница 493: ......
Страница 521: ......
Страница 523: ......
Страница 555: ...840 Shutdowns 10 of 10 Jun 2001 Error Codes and Internal Diagnostics Agilent 6890 Gas Chromatograph Service Manual ...
Страница 580: ...900 Remote Access Remote Access information was not available for this printing ...
Страница 581: ......
Страница 583: ......
Страница 631: ......
Страница 637: ...1110 Valves Liquid sample valves 6 of 6 Jun 2001 Valves Agilent 6890 Gas Chromatograph Service Manual ...
Страница 647: ...1120 Valve Box Removing the valve box assembly 10 of 10 Jun 2001 Valves Agilent 6890 Gas Chromatograph Service Manual ...
Страница 675: ...1150 Troubleshooting Pressure check 6 of 6 Jun 2001 Valves Agilent 6890 Gas Chromatograph Service Manual ...
Страница 677: ......
Страница 717: ...1225 Main Board 6890N Fuses 6 of 6 Jun 2001 Electrical Agilent 6890 Gas Chromatograph Service Manual ...
Страница 737: ......