
27 of 46
Jun 2001
Agilent 6890 Gas Chromatograph Service Manual
Programmed Temperature Vaporization Inlet (PTV)
240
Replacement procedures
4.
Lift the filter trap from the mounting bracket and unscrew the filter trap
assembly.
5.
Remove the old filter and O-rings and replace them.
6.
Reassemble the trap.
Replacing the inlet adapter
The Graphpack–2M connector (the inlet adapter) at the bottom of the inlet is
sized to the column diameter. When installing a different diameter column,
change the adapter.
The adapter number is stamped on the side of the adapters. Select the smallest
hole diameter that will accept the column.
1.
Unscrew the column nut from the adapter. Remove the nut and the
column from the inlet.
2.
With a 6 mm wrench, remove the inlet adapter, being careful not to lose
the silver seal inside. Save the adapter for later use.
3.
Select the appropriate inlet adapter for the column to be installed. Insert
a new silver seal (part no. 5182-9763, package of five) into the adapter
and screw the adapter onto the inlet fingertight. Tighten the adapter an
additional 1/16 to 1/8 turn.
Be careful not to overtighten the adapter. The inlet can be damaged if the
adapter is forced. If the adapter leaks, check the silver seal and replace
it if necessary.
Column
ID
Inlet adapter
number
Quantity
Part no.
200 mm
31
1
5182-9754
250 mm
45
1
5182-9761
320 mm
45
1
5182-9761
530 mm
70
1
5182-9762
Содержание 6890 Series
Страница 1: ...6890 Series Gas Chromatograph Service Manual ...
Страница 2: ...6890 Series Gas Chromatograph Service Manual ...
Страница 27: ...24 of 24 Jun 2001 Contents Contents Agilent 6890 Gas Chromatograph Service Manual ...
Страница 29: ......
Страница 39: ......
Страница 195: ...260 Solvent Vapor Exit Accessory Leak testing 10 of 10 Jun 2001 Inlets Agilent 6890 Gas Chromatograph Service Manual ...
Страница 207: ......
Страница 389: ...360 Auxiliary EPC Replacement procedures 16 of 16 Jun 2001 Detectors Agilent 6890 Gas Chromatograph Service Manual ...
Страница 391: ......
Страница 459: ......
Страница 479: ...520 Gases Supplying valve actuator air 14 of 14 Jun 2001 Site Preparation Agilent 6890 Gas Chromatograph Service Manual ...
Страница 485: ...530 Power Grounding 6 of 6 Jun 2001 Site Preparation Agilent 6890 Gas Chromatograph Service Manual ...
Страница 491: ...540 Instrument Specifications Detectors 6 of 6 Jun 2001 Site Preparation Agilent 6890 Gas Chromatograph Service Manual ...
Страница 492: ...600 Performance Verification How to check the performance of the 6890 instrument 610 Checkout Chromatograms ...
Страница 493: ......
Страница 521: ......
Страница 523: ......
Страница 555: ...840 Shutdowns 10 of 10 Jun 2001 Error Codes and Internal Diagnostics Agilent 6890 Gas Chromatograph Service Manual ...
Страница 580: ...900 Remote Access Remote Access information was not available for this printing ...
Страница 581: ......
Страница 583: ......
Страница 631: ......
Страница 637: ...1110 Valves Liquid sample valves 6 of 6 Jun 2001 Valves Agilent 6890 Gas Chromatograph Service Manual ...
Страница 647: ...1120 Valve Box Removing the valve box assembly 10 of 10 Jun 2001 Valves Agilent 6890 Gas Chromatograph Service Manual ...
Страница 675: ...1150 Troubleshooting Pressure check 6 of 6 Jun 2001 Valves Agilent 6890 Gas Chromatograph Service Manual ...
Страница 677: ......
Страница 717: ...1225 Main Board 6890N Fuses 6 of 6 Jun 2001 Electrical Agilent 6890 Gas Chromatograph Service Manual ...
Страница 737: ......