Installation and commissioning
ABB Network Partner AB
1MRK 580 166-XEN
Page
3 - 13
Version 1.0-00
Events occurring while the terminal is set in test mode can reported to the
SCS system in these ways:
• All event are reported.
• No events are reported.
• Events are reported according to the event mask.
This selection is made in SMS or in SCS.
4.1 Test of internal circuits
The A/D conversion module, the power supply module, the main process-
ing module, the signal processing module, and the In/Out modules are
continuously supervised and internal signals present the result (OK,
Warning, or Failure). If an internal fault is detected, this is indicated on
the built-in MMI. In the front-connected PC or SMS, the fault creates an
event in the internal event list.
The power supply is supervised continuously and if a failure occur, or if
the internal signal INT--FAIL is activated, a special output contact on the
power supply module is activated (Internal fail).
4.2 Secondary injection
test
Secondary injection testing is a normal part of the commissioning work of
a terminal with analogue inputs. Check the operating value of all func-
tions. The test set should be able to provide a three-phase supply of volt-
ages and currents. The magnitude of voltage and current, and the phase
angle between voltage and current must be variable. The voltages and cur-
rents from the test set must be obtained from the same source, and they
must have a very small harmonic contents. If the test set cannot indicate
the phase angle, you need a separate phase-angle meter.
The time-lag elements need not be switched off to record the operating
characteristic for the different zones, because operation for each zone can
be read as indications on the MMI.
Note that this terminal is designed for a maximum continuous cur-
rent of four times the nominal current.
4.3 Check of external
connections
When a line terminal will go into service, you must check that the
intended voltages and currents reach the relay. Also check the phase
sequence and identify each phase in both the voltage and the current cir-
cuits.
Firmly tighten all screw terminals.
COMBITEST test switch RTXP 24
The terminal can be equipped with a test switch of type RTXP 24. The test
switch and its associated test plug handle (RTXH 24) are a part of the
COMBITEST system, which is described in Buyer’s Guide COMBITEST
Test system (1MRK 512 001-BEN).
Содержание REC 561
Страница 19: ...ABB Network Partner AB Introduction REC 561 Version 1 0 00 1MRK 580 146 XEN Page 2 14 ...
Страница 31: ...ABB Network Partner AB Requirements and basic technical data REC 561 Version 1 0 00 Page 2 26 ...
Страница 49: ...ABB Network Partner AB Page IV ...
Страница 67: ...ABB Network Partner AB Installation and commissioning Version 1 0 00 1MRK 580 166 XEN Page 3 18 ...
Страница 85: ...ABB Network Partner AB Local man machine communication Version 1 0 00 1MRK 580 156 XEN Page 3 36 ...
Страница 121: ...ABB Network Partner AB Menu tree Appendix Version 1 0 00 1MRK 580 158 XEN Page 3 72 ...
Страница 139: ...ABB Network Partner AB Terminal identification Version 1 0 00 1MRK 580 160 XEN Page 4 4 ...
Страница 143: ...ABB Network Partner AB Activation of setting group Version 1 0 00 1MRK 580 162 XEN Page 4 8 ...
Страница 175: ...ABB Network Partner AB Configurable logic Version 1 0 00 1MRK 580 161 XEN Page 4 40 ...
Страница 261: ...ABB Network Partner AB Auto reclosing Single and or three phase Version 1 0 00 1MRK 580 170 XEN Page 5 82 ...
Страница 281: ...ABB Network Partner AB Loss of power system voltage Version 1 0 00 1MRK 580 153 XEN Page 5 102 ...
Страница 385: ...ABB Network Partner AB Apparatus control Version 1 0 00 1MRK 580 150 XEN Page 6 100 ...
Страница 495: ...ABB Network Partner AB Interlocking Version 1 0 00 1MRK 580 151 XEN Page 6 210 ...
Страница 515: ...ABB Network Partner AB Event function Version 1 0 00 1MRK 580 140 XEN Page 6 230 ...
Страница 519: ...ABB Network Partner AB Page IV ...
Страница 561: ...ABB Network Partner AB Time synchronisation Version 1 0 00 1MRK 580 135 XEN Page 7 42 ...
Страница 569: ...ABB Network Partner AB Internal events Version 1 0 00 1MRK 580 134 XEN Page 7 50 ...
Страница 599: ...ABB Network Partner AB Index Version 1 0 01 1MRK 580 175 XEN Page 8 6 ...
Страница 634: ......
Страница 635: ......
Страница 636: ......
Страница 637: ......
Страница 638: ......
Страница 639: ......
Страница 640: ......
Страница 641: ......
Страница 642: ......
Страница 643: ......