Event function
ABB Network Partner AB
1MRK 580 140-XEN
Page
6 - 223
Version 1.0-00
3.3 Communication
between terminals
The BOUND and INTERVAL inputs are available on the Event function
block in REC 561 control terminal.
The BOUND input set to 1 means that the output value of the event block
is bound to another control terminal on the LON bus. The Event function
block is then used to send data over the LON bus to other REC 561 con-
trol terminals. The most common use is to transfer interlocking informa-
tion between different bays. That can be performed by an Event function
block used as a send block and with a Multiple Command function block
used as a receive block. In Apparatus Control, (1MRK 580 150-XEN)
describes how to transfer the interlocking information. The configuration
of the communication between control terminals is made by the LON Net-
work Tool.
The INTERVAL input is applicable only when the BOUND input is set to
1. The INTERVAL is intended to be used for cyclic sending of data to
other control terminals via the LON bus with the interval time as set. This
cyclic sending of data is used as a backup of the event-driven sending,
which is always performed. With cyclic sending of data, the communica-
tion can be supervised by a corresponding INTERVAL input on the Mul-
tiple Command function block in another control terminal connected to
the LON bus. This INTERVAL input time is set a little bit longer than the
interval time set on the Event function block (see “Command function”,
1MRK 580 165-XEN). With INTERVAL=0, only event-driven sending is
performed.
The event-driven sending of data to other control terminals over the LON
bus is performed with a resolution of typical 200 ms.
Содержание REC 561
Страница 19: ...ABB Network Partner AB Introduction REC 561 Version 1 0 00 1MRK 580 146 XEN Page 2 14 ...
Страница 31: ...ABB Network Partner AB Requirements and basic technical data REC 561 Version 1 0 00 Page 2 26 ...
Страница 49: ...ABB Network Partner AB Page IV ...
Страница 67: ...ABB Network Partner AB Installation and commissioning Version 1 0 00 1MRK 580 166 XEN Page 3 18 ...
Страница 85: ...ABB Network Partner AB Local man machine communication Version 1 0 00 1MRK 580 156 XEN Page 3 36 ...
Страница 121: ...ABB Network Partner AB Menu tree Appendix Version 1 0 00 1MRK 580 158 XEN Page 3 72 ...
Страница 139: ...ABB Network Partner AB Terminal identification Version 1 0 00 1MRK 580 160 XEN Page 4 4 ...
Страница 143: ...ABB Network Partner AB Activation of setting group Version 1 0 00 1MRK 580 162 XEN Page 4 8 ...
Страница 175: ...ABB Network Partner AB Configurable logic Version 1 0 00 1MRK 580 161 XEN Page 4 40 ...
Страница 261: ...ABB Network Partner AB Auto reclosing Single and or three phase Version 1 0 00 1MRK 580 170 XEN Page 5 82 ...
Страница 281: ...ABB Network Partner AB Loss of power system voltage Version 1 0 00 1MRK 580 153 XEN Page 5 102 ...
Страница 385: ...ABB Network Partner AB Apparatus control Version 1 0 00 1MRK 580 150 XEN Page 6 100 ...
Страница 495: ...ABB Network Partner AB Interlocking Version 1 0 00 1MRK 580 151 XEN Page 6 210 ...
Страница 515: ...ABB Network Partner AB Event function Version 1 0 00 1MRK 580 140 XEN Page 6 230 ...
Страница 519: ...ABB Network Partner AB Page IV ...
Страница 561: ...ABB Network Partner AB Time synchronisation Version 1 0 00 1MRK 580 135 XEN Page 7 42 ...
Страница 569: ...ABB Network Partner AB Internal events Version 1 0 00 1MRK 580 134 XEN Page 7 50 ...
Страница 599: ...ABB Network Partner AB Index Version 1 0 01 1MRK 580 175 XEN Page 8 6 ...
Страница 634: ......
Страница 635: ......
Страница 636: ......
Страница 637: ......
Страница 638: ......
Страница 639: ......
Страница 640: ......
Страница 641: ......
Страница 642: ......
Страница 643: ......