ABB Network Partner AB
Direct current measuring unit
Version 1.0-00
1MRK 580 154-XEN
Page 7
-
8
time increment. These products are added until the pre-set value is
exceeded. The last measured value (Y2 in Fig. 3) is reported and set as a
new base for the following measurements.
Fig. 3
Integrating dead-band supervision
4.3 Periodic reporting
Uses can select the periodic reporting of measured value in time intervals
between 1 and 3600 s. The measuring channel reports the value even if it
has not changed for more than the set limits of amplitude or integrating
dead-band supervision. To disable periodic reporting, set the reporting
time interval to 0 s.
4.4 Periodic reporting
with the dead-band
supervision in parallel
The newly measured value is reported:
• After each time interval for the periodic reporting expired, or
• When the new value is detected by the dead-band supervision func-
tion
You can select the amplitude dead-band and the integrating dead-band.
You can set periodic reporting in time intervals between 1 and 3600 sec-
onds.
4.5 Periodic reporting
with the dead-band
supervision in series
Periodic reporting can operate serially with the dead-band supervision.
This means that the new value is reported only if the set time period
expired and if the dead-band limit was exceeded during the observed time.
The reporting of the new value depends on setting parameters for the
dead-band and for the periodic reporting. Table 1 presents the dependence
between different settings and the type of reporting for the new value of a
measured quantity.
1
2
3
4
5
6
Y1
Y2
Y3
reported values
Y
t
(x80154-3)
Содержание REC 561
Страница 19: ...ABB Network Partner AB Introduction REC 561 Version 1 0 00 1MRK 580 146 XEN Page 2 14 ...
Страница 31: ...ABB Network Partner AB Requirements and basic technical data REC 561 Version 1 0 00 Page 2 26 ...
Страница 49: ...ABB Network Partner AB Page IV ...
Страница 67: ...ABB Network Partner AB Installation and commissioning Version 1 0 00 1MRK 580 166 XEN Page 3 18 ...
Страница 85: ...ABB Network Partner AB Local man machine communication Version 1 0 00 1MRK 580 156 XEN Page 3 36 ...
Страница 121: ...ABB Network Partner AB Menu tree Appendix Version 1 0 00 1MRK 580 158 XEN Page 3 72 ...
Страница 139: ...ABB Network Partner AB Terminal identification Version 1 0 00 1MRK 580 160 XEN Page 4 4 ...
Страница 143: ...ABB Network Partner AB Activation of setting group Version 1 0 00 1MRK 580 162 XEN Page 4 8 ...
Страница 175: ...ABB Network Partner AB Configurable logic Version 1 0 00 1MRK 580 161 XEN Page 4 40 ...
Страница 261: ...ABB Network Partner AB Auto reclosing Single and or three phase Version 1 0 00 1MRK 580 170 XEN Page 5 82 ...
Страница 281: ...ABB Network Partner AB Loss of power system voltage Version 1 0 00 1MRK 580 153 XEN Page 5 102 ...
Страница 385: ...ABB Network Partner AB Apparatus control Version 1 0 00 1MRK 580 150 XEN Page 6 100 ...
Страница 495: ...ABB Network Partner AB Interlocking Version 1 0 00 1MRK 580 151 XEN Page 6 210 ...
Страница 515: ...ABB Network Partner AB Event function Version 1 0 00 1MRK 580 140 XEN Page 6 230 ...
Страница 519: ...ABB Network Partner AB Page IV ...
Страница 561: ...ABB Network Partner AB Time synchronisation Version 1 0 00 1MRK 580 135 XEN Page 7 42 ...
Страница 569: ...ABB Network Partner AB Internal events Version 1 0 00 1MRK 580 134 XEN Page 7 50 ...
Страница 599: ...ABB Network Partner AB Index Version 1 0 01 1MRK 580 175 XEN Page 8 6 ...
Страница 634: ......
Страница 635: ......
Страница 636: ......
Страница 637: ......
Страница 638: ......
Страница 639: ......
Страница 640: ......
Страница 641: ......
Страница 642: ......
Страница 643: ......