ABB Network Partner AB
Page I
Contents
Page
Application .............................................................................................. 5-1
Design .................................................................................................... 5-1
Three-phase front logic .................................................................. 5-1
Single-phase front logic.................................................................. 5-2
Tripping logic circuits...................................................................... 5-3
Testing.................................................................................................... 5-6
Appendix................................................................................................. 5-7
Terminal diagrams.......................................................................... 5-7
Signal list ........................................................................................ 5-7
Setting table ................................................................................... 5-8
Application .............................................................................................. 5-9
Synchronism check ........................................................................ 5-9
Energizing check .......................................................................... 5-11
Voltage selection .......................................................................... 5-12
Voltage selection for a single busbar ................................... 5-13
Voltage selection for a double bus....................................... 5-16
Theory of operation .............................................................................. 5-17
Synchro check.............................................................................. 5-17
Voltage-selection.......................................................................... 5-18
Setting .................................................................................................. 5-20
Operation...................................................................................... 5-20
Input phase................................................................................... 5-21
UMeasure..................................................................................... 5-21
USelection .................................................................................... 5-21
AutoEnerg and ManEnerg............................................................ 5-21
Testing.................................................................................................. 5-22
Test equipment............................................................................. 5-22
Synchro-check tests ..................................................................... 5-22
Test of voltage difference .................................................... 5-22
Test of phase difference ...................................................... 5-24
Test of frequency difference ................................................ 5-25
Test of reference voltage ..................................................... 5-25
Test of energizing check .............................................................. 5-25
Test of dead line live bus (DLLB)......................................... 5-25
Dead bus live line (DBLL) .................................................... 5-26
Energizing in both directions (DLLB or DBLL) ..................... 5-27
Test of voltage selection ...................................................... 5-27
Appendix............................................................................................... 5-29
Terminal diagrams........................................................................ 5-29
Содержание REC 561
Страница 19: ...ABB Network Partner AB Introduction REC 561 Version 1 0 00 1MRK 580 146 XEN Page 2 14 ...
Страница 31: ...ABB Network Partner AB Requirements and basic technical data REC 561 Version 1 0 00 Page 2 26 ...
Страница 49: ...ABB Network Partner AB Page IV ...
Страница 67: ...ABB Network Partner AB Installation and commissioning Version 1 0 00 1MRK 580 166 XEN Page 3 18 ...
Страница 85: ...ABB Network Partner AB Local man machine communication Version 1 0 00 1MRK 580 156 XEN Page 3 36 ...
Страница 121: ...ABB Network Partner AB Menu tree Appendix Version 1 0 00 1MRK 580 158 XEN Page 3 72 ...
Страница 139: ...ABB Network Partner AB Terminal identification Version 1 0 00 1MRK 580 160 XEN Page 4 4 ...
Страница 143: ...ABB Network Partner AB Activation of setting group Version 1 0 00 1MRK 580 162 XEN Page 4 8 ...
Страница 175: ...ABB Network Partner AB Configurable logic Version 1 0 00 1MRK 580 161 XEN Page 4 40 ...
Страница 261: ...ABB Network Partner AB Auto reclosing Single and or three phase Version 1 0 00 1MRK 580 170 XEN Page 5 82 ...
Страница 281: ...ABB Network Partner AB Loss of power system voltage Version 1 0 00 1MRK 580 153 XEN Page 5 102 ...
Страница 385: ...ABB Network Partner AB Apparatus control Version 1 0 00 1MRK 580 150 XEN Page 6 100 ...
Страница 495: ...ABB Network Partner AB Interlocking Version 1 0 00 1MRK 580 151 XEN Page 6 210 ...
Страница 515: ...ABB Network Partner AB Event function Version 1 0 00 1MRK 580 140 XEN Page 6 230 ...
Страница 519: ...ABB Network Partner AB Page IV ...
Страница 561: ...ABB Network Partner AB Time synchronisation Version 1 0 00 1MRK 580 135 XEN Page 7 42 ...
Страница 569: ...ABB Network Partner AB Internal events Version 1 0 00 1MRK 580 134 XEN Page 7 50 ...
Страница 599: ...ABB Network Partner AB Index Version 1 0 01 1MRK 580 175 XEN Page 8 6 ...
Страница 634: ......
Страница 635: ......
Страница 636: ......
Страница 637: ......
Страница 638: ......
Страница 639: ......
Страница 640: ......
Страница 641: ......
Страница 642: ......
Страница 643: ......