Breaker-failure protection
ABB Network Partner AB
1MRK 580 171-XEN
Page
5 - 91
Version 1.0-00
MMI submenu:
Settings
Functions
Group n
Breaker Failure
If the settings are changed to speed up times during the tests, they
must later be reset and verified.
5.2 Check that the
protection does not
trip when set passive
2.1
Set operation = Off.
2.2
Apply a stationary current over the set value.
2.3
Apply a start pulse to BFP--STL1.
2.4
Verify that neither retrip nor back-up trip is achieved.
5.3 Check that the
protection can be
started from all start
inputs
3.1
Set RetripType = No I>check, I> = 100% I
r
and t1 = 50 ms.
3.2
Apply a stationary three-phase current over the set value.
3.3
Apply a start pulse to BFP--STL1.
3.4
Verify that retrip in phase L1 is achieved.
3.5
Apply a stationary current over the set value.
3.6
Apply a start pulse to BFP--ST3PH.
3.7
Verify that all three retrips are achieved.
5.4 Check that the retrip
function works
4.1 No retrip function
4.1.1 Set RetripType = Retrip Off and I> = 100% I
r.
4.1.2 Apply a stationary three-phase current over the set value.
4.1.3 Apply a start pulse to BFP--STL1.
4.1.4 Verify that retrip in phase L1 is not achieved.
4.2 Retrip function with current check
4.2.1 Set RetripType = I> check, t1 = 100 ms and I> = 100% I
r
.
4.2.2 Apply a stationary three-phase current over the set value.
4.2.3 Apply a start pulse to BFP--STL1.
4.2.4 Verify that retrip is achieved.
4.3 Retrip function without current check
4.3.1 Set RetripType = No I> check, t1 = 100 ms and I> = 100% I
r
.
4.3.2 Apply a stationary three-phase current over the set value.
4.3.3 Apply a start pulse to BFP--STL1.
4.3.4 Verify that retrip is achieved.
Содержание REC 561
Страница 19: ...ABB Network Partner AB Introduction REC 561 Version 1 0 00 1MRK 580 146 XEN Page 2 14 ...
Страница 31: ...ABB Network Partner AB Requirements and basic technical data REC 561 Version 1 0 00 Page 2 26 ...
Страница 49: ...ABB Network Partner AB Page IV ...
Страница 67: ...ABB Network Partner AB Installation and commissioning Version 1 0 00 1MRK 580 166 XEN Page 3 18 ...
Страница 85: ...ABB Network Partner AB Local man machine communication Version 1 0 00 1MRK 580 156 XEN Page 3 36 ...
Страница 121: ...ABB Network Partner AB Menu tree Appendix Version 1 0 00 1MRK 580 158 XEN Page 3 72 ...
Страница 139: ...ABB Network Partner AB Terminal identification Version 1 0 00 1MRK 580 160 XEN Page 4 4 ...
Страница 143: ...ABB Network Partner AB Activation of setting group Version 1 0 00 1MRK 580 162 XEN Page 4 8 ...
Страница 175: ...ABB Network Partner AB Configurable logic Version 1 0 00 1MRK 580 161 XEN Page 4 40 ...
Страница 261: ...ABB Network Partner AB Auto reclosing Single and or three phase Version 1 0 00 1MRK 580 170 XEN Page 5 82 ...
Страница 281: ...ABB Network Partner AB Loss of power system voltage Version 1 0 00 1MRK 580 153 XEN Page 5 102 ...
Страница 385: ...ABB Network Partner AB Apparatus control Version 1 0 00 1MRK 580 150 XEN Page 6 100 ...
Страница 495: ...ABB Network Partner AB Interlocking Version 1 0 00 1MRK 580 151 XEN Page 6 210 ...
Страница 515: ...ABB Network Partner AB Event function Version 1 0 00 1MRK 580 140 XEN Page 6 230 ...
Страница 519: ...ABB Network Partner AB Page IV ...
Страница 561: ...ABB Network Partner AB Time synchronisation Version 1 0 00 1MRK 580 135 XEN Page 7 42 ...
Страница 569: ...ABB Network Partner AB Internal events Version 1 0 00 1MRK 580 134 XEN Page 7 50 ...
Страница 599: ...ABB Network Partner AB Index Version 1 0 01 1MRK 580 175 XEN Page 8 6 ...
Страница 634: ......
Страница 635: ......
Страница 636: ......
Страница 637: ......
Страница 638: ......
Страница 639: ......
Страница 640: ......
Страница 641: ......
Страница 642: ......
Страница 643: ......