5 Testing
5.1 General
The operating values of the current and voltage measuring elements and
corresponding functions within the REx 5xx protection, control and mon-
itoring terminals must be checked during the commissioning and during
regular maintenance tests. ABB Network Partner recommends, although it
does not absolutely request, the use of testing equipment of type RTS 21
(FREJA) for purposes of secondary injection testing.
The test equipment used should be capable of providing an independent
three-phase supply of voltages and currents to the tested terminal. It must
be possible to separately change the values of voltages, currents, and
phase angles among the measuring quantities, independent of each other,
for each phase. The test voltages and currents should have a common
source, with a very small content of higher harmonics. If the test equip-
ment cannot indicate the phase angles between the measured quantities, a
separate phase angle meter is needed.
Before testing, it is necessary to connect the testing equipment according
to the valid terminal diagram of the particular REx 5xx terminal. Pay spe-
cial attention to the correct connection of the input and output current ter-
minals, and to the connection of the residual current. Follow these steps to
test the loss-of-power system voltage function :
1.1
Activate the operation of the function under the submenu by setting
the parameter Operation = On:
Settings
Functions
Group n
LossOfVoltage
1.2
Check if the input and output logical signals as shown in Fig. 1 are
configured to the corresponding binary inputs and outputs of the
tested terminal. If not, configure them for testing purposes. The
configuration of the LOV--VTSU and LOV--BC functional inputs,
respectively occurs under the submenu:
Configuration
FunctionInputs
LossOfVoltage
The LOV--VTSU signal should be configured to the FUSE-VTSU
output signal under the fuse failure supervision function. The LOV-
-BC signal should be configured to one of the available binary
inputs of the tested terminal.
Содержание REC 561
Страница 19: ...ABB Network Partner AB Introduction REC 561 Version 1 0 00 1MRK 580 146 XEN Page 2 14 ...
Страница 31: ...ABB Network Partner AB Requirements and basic technical data REC 561 Version 1 0 00 Page 2 26 ...
Страница 49: ...ABB Network Partner AB Page IV ...
Страница 67: ...ABB Network Partner AB Installation and commissioning Version 1 0 00 1MRK 580 166 XEN Page 3 18 ...
Страница 85: ...ABB Network Partner AB Local man machine communication Version 1 0 00 1MRK 580 156 XEN Page 3 36 ...
Страница 121: ...ABB Network Partner AB Menu tree Appendix Version 1 0 00 1MRK 580 158 XEN Page 3 72 ...
Страница 139: ...ABB Network Partner AB Terminal identification Version 1 0 00 1MRK 580 160 XEN Page 4 4 ...
Страница 143: ...ABB Network Partner AB Activation of setting group Version 1 0 00 1MRK 580 162 XEN Page 4 8 ...
Страница 175: ...ABB Network Partner AB Configurable logic Version 1 0 00 1MRK 580 161 XEN Page 4 40 ...
Страница 261: ...ABB Network Partner AB Auto reclosing Single and or three phase Version 1 0 00 1MRK 580 170 XEN Page 5 82 ...
Страница 281: ...ABB Network Partner AB Loss of power system voltage Version 1 0 00 1MRK 580 153 XEN Page 5 102 ...
Страница 385: ...ABB Network Partner AB Apparatus control Version 1 0 00 1MRK 580 150 XEN Page 6 100 ...
Страница 495: ...ABB Network Partner AB Interlocking Version 1 0 00 1MRK 580 151 XEN Page 6 210 ...
Страница 515: ...ABB Network Partner AB Event function Version 1 0 00 1MRK 580 140 XEN Page 6 230 ...
Страница 519: ...ABB Network Partner AB Page IV ...
Страница 561: ...ABB Network Partner AB Time synchronisation Version 1 0 00 1MRK 580 135 XEN Page 7 42 ...
Страница 569: ...ABB Network Partner AB Internal events Version 1 0 00 1MRK 580 134 XEN Page 7 50 ...
Страница 599: ...ABB Network Partner AB Index Version 1 0 01 1MRK 580 175 XEN Page 8 6 ...
Страница 634: ......
Страница 635: ......
Страница 636: ......
Страница 637: ......
Страница 638: ......
Страница 639: ......
Страница 640: ......
Страница 641: ......
Страница 642: ......
Страница 643: ......