79
Actual signals and parameters
Actual signals and parameters
What this chapter contains
The chapter describes the actual signals and parameters. It also contains a table of
the default values for the different macros.
Terms and abbreviations
Term
Definition
Actual signal
Signal measured or calculated by the drive. Can be monitored by the user.
No user setting possible. Groups 01...04 contain actual signals.
Def
Parameter default value
Parameter
A user-adjustable operation instruction of the drive. Groups 10...99 contain
parameters.
E
Refers to types 01E- and 03E- with European parametrization
U
Refers to types 01U- and 03U- with US parametrization
Default parameter values with different macros
When application macro is changed (
9902
APPLIC MACRO), the software updates
the parameter values to their default values. The following table includes the
parameter default values for different macros. For other parameters, the default
values are the same for all macros (see section
Actual signals
on page
84
).
Index
Name/
Selection
ABB
STANDARD
3-WIRE
ALTERNATE
MOTOR POT
HAND/AUTO
PID CONTROL
1001
EXT1
COMMANDS
2 = DI1,2
4 = DI1P,2P,3
9 = DI1F,2R
2 = DI1,2
2 = DI1,2
1 = DI1
1002
EXT2
COMMANDS
0 = NOT SEL
0 = NOT SEL
0 = NOT SEL
0 = NOT SEL
21 = DI5,4
20 = DI5
1003
DIRECTION
3 = REQUEST
3 = REQUEST
3 = REQUEST
3 = REQUEST
3 = REQUEST
1 = FORWARD
1102
EXT1/EXT2
SEL
0 = EXT1
0 = EXT1
0 = EXT1
0 = EXT1
3 = DI3
2 = DI2
1103
REF1 SELECT
1 = AI1
1 = AI1
1 = AI1
12 =
DI3U,4D(NC)
1 = AI1
2 = POT
1106
REF2 SELECT
2 = POT
2 = POT
2 = POT
1 = AI1
2 = POT
19 = PID1OUT
1201
CONST
SPEED SEL
9 = DI3,4
10 = DI4,5
9 = DI3,4
5 = DI5
0 = NOT SEL
3 = DI3
1301
MINIMUM AI1
0.0%
0.0%
0.0%
0.0%
20.0%
20.0%
1601
RUN ENABLE
0 = NOT SEL
0 = NOT SEL
0 = NOT SEL
0 = NOT SEL
0 = NOT SEL
4 = DI4
2201
ACC/DEC 1/2
SEL
5 = DI5
0 = NOT SEL
5 = DI5
0 = NOT SEL
0 = NOT SEL
0 = NOT SEL
9902
APPLIC
MACRO
1 = ABB
STANDARD
2 = 3-WIRE
3 =
ALTERNATE
4 = MOTOR
POT
5 = HAND/
AUTO
6 = PID
CONTROL
Содержание ACS150 series
Страница 4: ......
Страница 5: ......
Страница 15: ...14 Safety ...
Страница 19: ...18 Introduction to the manual ...
Страница 39: ...38 Planning the electrical installation ...
Страница 51: ...50 Installation checklist ...
Страница 57: ...56 Start up and control with I O ...
Страница 69: ...68 Control panel ...
Страница 79: ...78 Application macros ...
Страница 160: ...L Q M 0 I II D I II I I ro I m D en m D D Q Q f 3AFE68633931 A 0 Frame size R2 IP20 INEMA 1 ...
Страница 161: ...ji 4 I 5 I 6 4 J ...
Страница 162: ......
Страница 163: ...160 Dimension drawings ...
Страница 169: ...166 Appendix Process PID control ...
Страница 171: ...168 ...