42
Electrical installation
Connection procedure
1. Fasten the input power cable under the grounding clamp. Crimp a cable lug onto
the grounding conductor (PE) of the cable and fasten the lug under a grounding
clamp screw.
2. Connect the phase conductors to the U1, V1 and W1 terminals. Use a tightening
torque of 0.8 N·m (7 lbf·in).
2
1
3. Strip the motor cable and twist the shield to form as short a pigtail as possible.
Fasten the stripped motor cable under the grounding clamp. Crimp a cable lug
onto the pigtail and fasten the lug under a grounding clamp screw.
3
Tightening torque:
0.8 N·m (7 lbf
·
in)
Содержание ACS150 series
Страница 4: ......
Страница 5: ......
Страница 15: ...14 Safety ...
Страница 19: ...18 Introduction to the manual ...
Страница 39: ...38 Planning the electrical installation ...
Страница 51: ...50 Installation checklist ...
Страница 57: ...56 Start up and control with I O ...
Страница 69: ...68 Control panel ...
Страница 79: ...78 Application macros ...
Страница 160: ...L Q M 0 I II D I II I I ro I m D en m D D Q Q f 3AFE68633931 A 0 Frame size R2 IP20 INEMA 1 ...
Страница 161: ...ji 4 I 5 I 6 4 J ...
Страница 162: ......
Страница 163: ...160 Dimension drawings ...
Страница 169: ...166 Appendix Process PID control ...
Страница 171: ...168 ...