
Prestige 652 Series User’s Guide
System Maintenance
39-3
Figure 39-4 Menu 24.9.1 System Maintenance : Budget Management
The total budget is the time limit on the accumulated time for outgoing calls to a remote node. When this
limit is reached, the call will be dropped and further outgoing calls to that remote node will be blocked.
After each period, the total budget is reset. The default for the total budget is 0 minutes and the period is 0
hours, meaning no budget control. You can reset the accumulated connection time in this menu by entering
the index of a remote node. Enter 0 to update the screen. The budget and the reset period can be configured
in menu 11.1 for the remote node when PPPoE encapsulation is selected.
Table 39-1 Menu 24.9.1 System Maintenance : Budget Management
FIELD DESCRIPTION
EXAMPLE
Remote Node
Enter the index number of the remote node you
want to reset (just one in this case)
1
Connection Time/Total
Budget
This is the total connection time that has gone by
(within the allocated budget that you set in menu
11.1.
5/10 means that 5
minutes out of a
total allocation of
10 minutes have
lapsed.
Elapsed Time/Total
Period
The period is the time cycle in hours that the
allocation budget is reset (see
menu 11.1.) The
elapsed time is the time used up within this period.
0.5/1 means that
30 minutes out of
the 1 hour time
period has lapsed.
Enter “0” to update the screen or press [ESC] to return to the previous screen.
Menu 24.9.1 - System Maintenance - Budget Management
Remote Node
1.ChangeMe
2.--------
3.--------
4.--------
5.--------
6.--------
7.--------
8.--------
Connection Time/Total Budget
No Budget
---
---
---
---
---
---
---
Elapsed Time/Total Period
No Budget
---
---
---
---
---
---
---
Reset Node (0 to update screen):
Summary of Contents for Prestige 652
Page 1: ...Prestige 652 Series ADSL Security Wireless LAN Router User s Guide Version 3 40 August 2003...
Page 92: ......
Page 104: ...Prestige 652 Series User s Guide 7 12 WAN Setup Figure 7 6 Advanced WAN Backup...
Page 112: ......
Page 133: ......
Page 147: ......
Page 192: ...Prestige 652 Series User s Guide 17 8 VPN Screens Figure 17 3 VPN IKE...
Page 232: ......
Page 252: ...Maintenance VIII Part VIII Maintenance This part covers the maintenance screens...
Page 254: ...Prestige 652 Series User s Guide 22 2 Maintenance Figure 22 1 System Status...
Page 268: ......
Page 278: ......
Page 294: ......
Page 310: ......
Page 352: ......
Page 414: ......
Page 418: ......
Page 428: ......
Page 434: ......
Page 440: ......
Page 452: ......
Page 456: ......
Page 496: ......
Page 510: ......