![background image](http://html.mh-extra.com/html/zeiss/crossbeam-340/crossbeam-340_instruction-manual_927492110.webp)
NNM=çÑ=NPQ
fåëíêìÅíáçå=j~åì~ä=`êçëëÄÉ~ã=PQM
=
ÉåMOE`loF
TK=j~áåíÉå~åÅÉ=~åÇ=êÉé~áê
`Ü~åÖÉ=çÑ=Åçåëìã~ÄäÉë=~åÇ=ÅÜÉãáÅ~äë
7.3. Change of consumables and chemicals
The change of consumables and chemicals have to be done by a Carl Zeiss servce engineer in
mandatory intervals.
The times scheduled are designed for the maximum equipment performance level:
1
There is no warranty on field emission guns; manufacturers do not guarantee any lifetime.
Interval
Component/Part
Every 6000 h
1
(filament on)
Field emission gun
1
Copper seal at gun head
As required or yearly
(and after exchange of field emission gun)
Standard aperture
Anode aperture
Extractor aperture
Anode aluminium seal
Copper seal at gun head
Yearly or as required
Pre-vacuum pump
Yearly
SE2 detector
In-lens SE detector
As required
Ion source
With every ion source replacement
FIB aperture
Upgraded workstation
If used up
Precursors
Table 7.1: Time schedule
Summary of Contents for Crossbeam 340
Page 1: ...Crossbeam 340 Crossbeam workstation Instruction Manual ...
Page 24: ...OQ çÑ NPQ fåëíêìÅíáçå j åì ä êçëëÄÉ ã PQM ÉåMOE loF OK p ÑÉíó p ÑÉíó ÉèìáéãÉåí ...
Page 60: ...SM çÑ NPQ fåëíêìÅíáçå j åì ä êçëëÄÉ ã PQM ÉåMOE loF RK fåëí ää íáçå ...
Page 120: ...NOM çÑ NPQ fåëíêìÅíáçå j åì ä êçëëÄÉ ã PQM ÉåMOE loF UK qêçìÄäÉëÜççíáåÖ mçïÉê ÅáêÅìáí ...
Page 126: ...NOS çÑ NPQ fåëíêìÅíáçå j åì ä êçëëÄÉ ã PQM ÉåMOE loF NNK ÄÄêÉîá íáçåë ...
Page 130: ...NPM çÑ NPQ fåëíêìÅíáçå j åì ä êçëëÄÉ ã PQM ÉåMOE loF NPK aÉÅä ê íáçå çÑ ÅçåÑçêãáíó ...
Page 133: ......