![background image](http://html.mh-extra.com/html/zeiss/crossbeam-340/crossbeam-340_instruction-manual_927492109.webp)
TK=j~áåíÉå~åÅÉ=~åÇ=êÉé~áê
fåëíêìÅíáçå=j~åì~ä=`êçëëÄÉ~ã=PQM
=
ÉåMOE`loF
=NMV=çÑ=NPQ
j~áåíÉå~åÅÉ=ïçêâ
7. Maintenance and repair
To maintain best performance of the microscope it is essential to perform preventive maintenance
at regular intervals.
7.1. Maintenance work
The preventive maintenance is performed by the ZEISS service representative and includes the
following items:
•
Inspection
•
Preventive maintenance work
•
Change of consumables and chemicals
•
Equipment test
•
Verification run
IMPORTANT
The mainenance work will be accomplished according to standardized maintenance plans
and will be recorded by the ZEISS service representative.
7.2. Maintenance intervals
The maintenance intervals depend on the period of application of the device:
•
24/7: annually
•
8/5: semiannually
IMPORTANT
Plan maintenance work and order the ZEISS service representative early.
A list of ZEISS locations and authorised service partners can be found at:
http://www.zeiss.com/microscopy
Summary of Contents for Crossbeam 340
Page 1: ...Crossbeam 340 Crossbeam workstation Instruction Manual ...
Page 24: ...OQ çÑ NPQ fåëíêìÅíáçå j åì ä êçëëÄÉ ã PQM ÉåMOE loF OK p ÑÉíó p ÑÉíó ÉèìáéãÉåí ...
Page 60: ...SM çÑ NPQ fåëíêìÅíáçå j åì ä êçëëÄÉ ã PQM ÉåMOE loF RK fåëí ää íáçå ...
Page 120: ...NOM çÑ NPQ fåëíêìÅíáçå j åì ä êçëëÄÉ ã PQM ÉåMOE loF UK qêçìÄäÉëÜççíáåÖ mçïÉê ÅáêÅìáí ...
Page 126: ...NOS çÑ NPQ fåëíêìÅíáçå j åì ä êçëëÄÉ ã PQM ÉåMOE loF NNK ÄÄêÉîá íáçåë ...
Page 130: ...NPM çÑ NPQ fåëíêìÅíáçå j åì ä êçëëÄÉ ã PQM ÉåMOE loF NPK aÉÅä ê íáçå çÑ ÅçåÑçêãáíó ...
Page 133: ......