5 - 4
ENG
ENGINE
EAS00191
ENGINE
7
7
11
9
14
9
5
6
12
4
4
15
1
2
3
6
5
8
10
13
10
16
T
R
.
.
45 Nm (4.5 m
•
kg, 32 ft
•
Ib)
T
R
.
.
55 Nm (5.5 m
•
kg, 40 ft
•
Ib)
T
R
.
.
55 Nm (5.5 m
•
kg, 40 ft
•
Ib)
T
R
.
.
24 Nm (2.4 m
•
kg, 17 ft
•
Ib)
T
R
.
.
18 Nm (1.8 m
•
kg, 13 ft
•
Ib)
16 Nm (1.6 m
•
kg, 11 ft
•
Ib)
T
R
.
.
T
R
.
.
55 Nm (5.5 m
•
kg, 40 ft
•
Ib)
T
R
.
.
55 Nm (5.5 m
•
kg, 40 ft
•
Ib)
T
R
.
.
24 Nm (2.4 m
•
kg, 17 ft
•
Ib)
T
R
.
.
36 Nm (3.6 m
•
kg, 25 ft
•
Ib)
T
R
.
.
36 Nm (3.6 m
•
kg, 25 ft
•
Ib)
T
R
.
.
32 Nm (3.2 m
•
kg, 23 ft
•
Ib)
T
R
.
.
45 Nm (4.5 m
•
kg, 32 ft
•
Ib)
Order
Job/Part
Q’ty
Remarks
Removing the engine
Remove the parts in the order listed.
NOTE:
@
Place a suitable stand under the frame
and engine.
1
Bolt (engine bracket 1 and engine)
2
Refer to “INSTALLING THE ENGINE”.
2
Bolt (engine bracket 1 and frame)
1
3
Engine bracket 1
1
4
Bolt (engine bracket 2 and frame)
4
5
Bolt (engine bracket 2 and engine)
2
6
Engine bracket 2
2
7
Pinch bolt
2
8
Pinch bolt
2
9
Front mounting bolt (right)
2
10
Front mounting bolt (left)
2
Summary of Contents for FJR1300
Page 1: ...LIT 11616 16 18 5JW 28197 10 FJR1300R FJR1300RC SERVICE MANUAL ...
Page 6: ......
Page 82: ...2 22 SPEC TIGHTENING TORQUES Cylinder head tightening sequence Crankcase tightening sequence ...
Page 89: ...2 29 SPEC 1 Crankshaft 2 Main axle 3 Drive axle OIL FLOW DIAGRAMS ...
Page 90: ...2 30 SPEC 1 Oil nozzle 2 Main gallery bolt 3 Crankshaft OIL FLOW DIAGRAMS ...
Page 91: ...2 31 SPEC 1 Main axle 2 Drive axle 3 Oil delivery pipe OIL FLOW DIAGRAMS ...
Page 92: ...2 32 SPEC 1 Exhaust camshaft 2 Oil check bolt 3 Intake camshaft OIL FLOW DIAGRAMS ...
Page 94: ...2 34 SPEC 1 Crank pin 2 Crankshaft OIL FLOW DIAGRAMS ...
Page 97: ...2 37 SPEC 1 Main axle 2 Drive axle 3 Middle drive shaft OIL FLOW DIAGRAMS ...
Page 98: ...2 38 SPEC COOLING SYSTEM DIAGRAMS 1 Radiator COOLING SYSTEM DIAGRAMS ...
Page 99: ...2 39 SPEC 1 Water jacket joint 2 Oil cooler COOLING SYSTEM DIAGRAMS ...
Page 101: ...2 41 SPEC 1 Coolant reservoir 2 Radiator 3 Water pump COOLING SYSTEM DIAGRAMS ...
Page 107: ...2 47 SPEC CABLE ROUTING 1 Tail brake light lead ...
Page 196: ...3 80 CHK ADJ ADJUSTING THE HEADLIGHT BEAMS ...
Page 288: ...4 92 CHAS 3 Install bearing 1 to the swingarm Installed depth a 4 0 mm 0 16 in SWINGARM ...
Page 531: ...8 35 ELEC LIGHTING SYSTEM ...
Page 570: ......
Page 571: ...YAMAHA MOTOR CO LTD 2500 SHINGAI IWATA SHIZUOKA JAPAN PRINTED IN U S A ...