4 - 76
CHAS
HANDLEBARS
4. Install:
• brake master cylinder
• brake master cylinder holder
1
NOTE:
@
• Install the brake master cylinder holder with
the “UP” mark facing up.
• First, tighten the upper bolt, and then the
lower bolt.
• Align the mating surfaces of the brake mas-
ter cylinder holder with the punch mark
a
in
the right handlebar.
T
R
.
.
10 Nm (1.0 m · kg, 7.2 ft · lb)
5. Install:
• handlebar grip
• grip end
▼▼▼
▼
▼ ▼▼▼
▼
▼ ▼▼▼
▼
▼ ▼▼▼
▼
▼ ▼▼▼
▼
▼ ▼▼▼
▼
▼▼▼
a. Apply a thin coat of rubber adhesive onto
the left end of the left handlebar.
b. Slide the handlebar grip over the left end of
the left handlebar.
c. Wipe off any excess rubber adhesive with a
clean rag.
WARNING
@
Do not touch the handlebar grip until the
rubber adhesive has fully dried.
NOTE:
There should be 1 ~ 3 mm (0.04 ~ 0.12 in) of
clearance
a
between the throttle grip and the
grip end.
▲▲▲
▲
▲ ▲▲▲
▲
▲ ▲▲▲
▲
▲ ▲▲▲
▲
▲ ▲▲▲
▲
▲ ▲▲▲
▲
▲▲▲
6. Install:
• left handlebar switch
1
NOTE:
@
Align the projection
a
on the left handlebar
switch with the hole
b
in the left handlebar.
T
R
.
.
4 Nm (0.4 m · kg, 2.9 ft · lb)
Summary of Contents for FJR1300
Page 1: ...LIT 11616 16 18 5JW 28197 10 FJR1300R FJR1300RC SERVICE MANUAL ...
Page 6: ......
Page 82: ...2 22 SPEC TIGHTENING TORQUES Cylinder head tightening sequence Crankcase tightening sequence ...
Page 89: ...2 29 SPEC 1 Crankshaft 2 Main axle 3 Drive axle OIL FLOW DIAGRAMS ...
Page 90: ...2 30 SPEC 1 Oil nozzle 2 Main gallery bolt 3 Crankshaft OIL FLOW DIAGRAMS ...
Page 91: ...2 31 SPEC 1 Main axle 2 Drive axle 3 Oil delivery pipe OIL FLOW DIAGRAMS ...
Page 92: ...2 32 SPEC 1 Exhaust camshaft 2 Oil check bolt 3 Intake camshaft OIL FLOW DIAGRAMS ...
Page 94: ...2 34 SPEC 1 Crank pin 2 Crankshaft OIL FLOW DIAGRAMS ...
Page 97: ...2 37 SPEC 1 Main axle 2 Drive axle 3 Middle drive shaft OIL FLOW DIAGRAMS ...
Page 98: ...2 38 SPEC COOLING SYSTEM DIAGRAMS 1 Radiator COOLING SYSTEM DIAGRAMS ...
Page 99: ...2 39 SPEC 1 Water jacket joint 2 Oil cooler COOLING SYSTEM DIAGRAMS ...
Page 101: ...2 41 SPEC 1 Coolant reservoir 2 Radiator 3 Water pump COOLING SYSTEM DIAGRAMS ...
Page 107: ...2 47 SPEC CABLE ROUTING 1 Tail brake light lead ...
Page 196: ...3 80 CHK ADJ ADJUSTING THE HEADLIGHT BEAMS ...
Page 288: ...4 92 CHAS 3 Install bearing 1 to the swingarm Installed depth a 4 0 mm 0 16 in SWINGARM ...
Page 531: ...8 35 ELEC LIGHTING SYSTEM ...
Page 570: ......
Page 571: ...YAMAHA MOTOR CO LTD 2500 SHINGAI IWATA SHIZUOKA JAPAN PRINTED IN U S A ...