8 - 43
–
+
ELEC
SIGNALING SYSTEM
EAS00753
YES
NO
YES
NO
3. Starting circuit cut-off relay
• Disconnect the starting circuit cut-off relay
from the wire harness.
• Connect the pocket tester (
Ω
×
1) to the
starting circuit cut-off relay terminals as
shown.
• Check the starting circuit cut-off relay for
continuity.
Tester positive probe
→
sky blue
1
Tester negative probe
→
light green
2
Continu-
ity
Tester positive probe
→
light green
2
Tester negative probe
→
sky blue
1
No conti-
nuity
NOTE:
@
When you switch the positive and negative
tester probes, the readings in the above chart
will be reversed.
@
• Are the tester readings correct?
Replace the starting
circuit cut-off relay.
Lg
L
/
G L
/
Y Sb B
/
Y L
/
W
R
/
B L
/
W
1
2
4. Voltage
• Connect the pocket tester (DC 20 V) to the
meter assembly coupler as shown.
Tester positive probe
→
brown/red
1
Tester negative probe
→
light green
2
• Set the main switch to “ON”.
• Measure the voltage (12 V).
• Is the voltage within specification?
Replace the wind-
shield drive unit.
The wiring circuit
from the main switch
to the meter assem-
bly coupler is faulty
and must be
repaired.
R
/
W G
/
W Y
/
L
Lg
Y
Ch
Dg
L
R
/
G B
/
W
Br
/
R
W
Summary of Contents for FJR1300
Page 1: ...LIT 11616 16 18 5JW 28197 10 FJR1300R FJR1300RC SERVICE MANUAL ...
Page 6: ......
Page 82: ...2 22 SPEC TIGHTENING TORQUES Cylinder head tightening sequence Crankcase tightening sequence ...
Page 89: ...2 29 SPEC 1 Crankshaft 2 Main axle 3 Drive axle OIL FLOW DIAGRAMS ...
Page 90: ...2 30 SPEC 1 Oil nozzle 2 Main gallery bolt 3 Crankshaft OIL FLOW DIAGRAMS ...
Page 91: ...2 31 SPEC 1 Main axle 2 Drive axle 3 Oil delivery pipe OIL FLOW DIAGRAMS ...
Page 92: ...2 32 SPEC 1 Exhaust camshaft 2 Oil check bolt 3 Intake camshaft OIL FLOW DIAGRAMS ...
Page 94: ...2 34 SPEC 1 Crank pin 2 Crankshaft OIL FLOW DIAGRAMS ...
Page 97: ...2 37 SPEC 1 Main axle 2 Drive axle 3 Middle drive shaft OIL FLOW DIAGRAMS ...
Page 98: ...2 38 SPEC COOLING SYSTEM DIAGRAMS 1 Radiator COOLING SYSTEM DIAGRAMS ...
Page 99: ...2 39 SPEC 1 Water jacket joint 2 Oil cooler COOLING SYSTEM DIAGRAMS ...
Page 101: ...2 41 SPEC 1 Coolant reservoir 2 Radiator 3 Water pump COOLING SYSTEM DIAGRAMS ...
Page 107: ...2 47 SPEC CABLE ROUTING 1 Tail brake light lead ...
Page 196: ...3 80 CHK ADJ ADJUSTING THE HEADLIGHT BEAMS ...
Page 288: ...4 92 CHAS 3 Install bearing 1 to the swingarm Installed depth a 4 0 mm 0 16 in SWINGARM ...
Page 531: ...8 35 ELEC LIGHTING SYSTEM ...
Page 570: ......
Page 571: ...YAMAHA MOTOR CO LTD 2500 SHINGAI IWATA SHIZUOKA JAPAN PRINTED IN U S A ...