BRKT
7-20
CLAMP BRACKETS (ET)
E
15
12
4
14
13
6
2
3
11
7
1
1
2
10
8
12 Nm(1.2 m kgf, 8.9 ft lb)
8 15 mm
10 45 mm
5
9
Order
Job/Part
Q’ty
Remarks
8
Bushing
1
9
Washer
1
10
Port clamp bracket
1
11
Through tube, self-locking nut
1
12
Spring pin
1
13
Stopper shaft
1
14
Bushing
1
15
Stopper knob
1
For installation, reverse the removal
procedure.
Summary of Contents for F40BMHD
Page 126: ...GENERAL 3 25 E CHK ADJ LUBRICATION POINTS Apply Water resistant grease ...
Page 128: ...CHK ADJ 3 26 GENERAL E ...
Page 129: ...3 26 CHK ADJ F D ES ...
Page 528: ......
Page 529: ......
Page 536: ......
Page 537: ...Printed on recycled paper Printed in Japan Sep 1999 1 7 1 F40B YAMAHA MOTOR CO LTD ...