7-1
E
BRKT
SHIFT ACTUATOR ASSY.
SHIFT ACTUATOR ASSY.
EXPLODED DIAGRAM
1
2
4
5
8
9
10
11
12
15
16
17
18 Nm (1.8 m
•
kg, 13 ft
•
Ib)
A
A
14
3
13
15
7
6
6
×
40 mm
6
×
25 mm
REMOVAL AND INSTALLATION CHART
Step
Procedure/Part name
Q’ty
Service points
SHIFT ACTUATOR ASSY.
DISASSEMBLY
Follow the left “Step” for removal.
Power unit assy.
Refer to “POWER UNIT” in chapter 5.
1
Clip
1
2
Bushing
1
3
Bolt
2
4
Shift bracket
1
5
Washer
1
6
Clip
1
7
Shift rod lever
1
8
Bolt
1
Summary of Contents for F100A
Page 51: ...F D ES SPEC 2 9 DIMENSIONS ABMESSUNGEN DIMENSIONES DIMENSIONS ABMESSUNGEN DIMENSIONES 9 ...
Page 58: ...2 13 SPEC E HOSE ROUTING HOSE ROUTING 2 1 3 1 Water hose 2 Blow by gas hose 3 Oil return hose ...
Page 394: ...8 4 ELEC E ELECTRICAL COMPONENTS Rear view 1 2 1 Spark plug 2 Spark plug lead ...
Page 462: ......
Page 463: ...Printed on recycled paper Printed in Japan Oct 2000 0 2 1 CR F100AET YAMAHA MOTOR CO LTD ...