The following describes the project planning of the air sampling smoke de-
tection system to EN 54-20 or ISO 7240-20. The basic conditions are de-
scribed in Chapter 5.1. The basic conditions are described in Chapter 5.1.
The project planning is to be conducted in accordance with Chapter 5.2.
The limiting project planning instructions in accordance with Chapter 5.2 ap-
ply to special applications in addition to Chapter 5.3 These should be taken
into consideration at the beginning of project planning for special projects.
Project planning options according to EN 54-20 or ISO 7240-20:
There are various technical solutions to be selected from, depending on the
project planning criteria. The chapters for the solutions are listed in the fol-
lowing tables.
Project planning
criterion
Technical solution
Basic Principles
Limitations
General area
monitoring
Standard project planning
Chapter 5.2
_
Recognition of a failure
at an individual aperture
Project planning for indi-
vidual aperture monitoring
Chapter 5.2
Chapter 5.3.1
Device protection /
cabinet monitoring
Simplified pipe project
planning
Chapter 5.2
Chapter 5.3.2
Ventilation conduits
Project planning for forced
air flow
Chapter 5.2
Chapter 5.3.5
5
5.1
Summary of Contents for Titanus Micro-Sens
Page 1: ...Air sampling smoke detection system Fire Detection TITANUS MICRO SENS Technical Manual ...
Page 2: ......
Page 4: ......
Page 12: ......
Page 16: ......
Page 24: ......
Page 74: ...Design TITANUS MICRO SENS 74 06 13 ...
Page 100: ......
Page 140: ......
Page 164: ......
Page 177: ...TITANUS MICRO SENS Commissioning 06 13 177 ...
Page 186: ......
Page 202: ......
Page 204: ......
Page 210: ......
Page 226: ......
Page 228: ......
Page 234: ...TITANUS MICRO SENS Glossary TMS_A_Glossar e DOC Data 01 09 ...
Page 235: ......
Page 236: ......
Page 237: ...TITANUS MICRO SENS 06 13 ...
Page 238: ...TITANUS MICRO SENS ...