Page
159
of
244
5.5.2.
Test Method
1. Complete the collimator setup and acquire the image in the stopped state.
2. Run the C:\VCaptureSW\Util\EzEval_Phantom\EzEval.exe program.
3.
Input the threshold 75%, and check whether the Collimator Alignment Result is
satisfied with
the standard.
5.5.3.
Test Result
Parameter
LSL
Measurement value
USL
Pass/Fail
Threshold
70%
Upper
1
10
Lower
1
10
Left
2
2
Right
1
2
Summary of Contents for A9 PHT-30CSS
Page 1: ...vatech A9 Technical manual Model PHT 30CSS Version 1 01 English...
Page 12: ...Page 11 of 244 1 2 1 Vertical Frame Part...
Page 22: ...Page 21 of 244 1 2 3 5 Generator DG 07E22T2...
Page 26: ...Page 25 of 244...
Page 27: ...Page 26 of 244...
Page 30: ...Page 29 of 244 1 3 3 Sensor Part Connection Diagram...
Page 31: ...Page 30 of 244 1 3 4 CEPH SENSOR Part Connection Diagram...
Page 32: ...Page 31 of 244 1 3 5 Connection Diagram Total assembly...
Page 43: ...Page 42 of 244 16 Loosen ten bolts as shown in the image below...
Page 112: ...Page 111 of 244 5 Click the V Vol button Click the Ready button...
Page 180: ...Page 179 of 244 10 Select 50 in the M box and click the center of the flat washer...
Page 209: ...Page 208 of 244 8 5 Appendix 8 5 1 Main MCU Board Parameters...
Page 244: ...vatech A9 www vatech com...