Page
103
of
244
2.7.
DAP Calibration
Follow the steps below to start a DAP calibration:
1. Position the dosimeter as illustrated below:
2. Click the Setting tab and click
Capture CTB
to confirm the dosimeter’s position and capture
the dark date.
3. After capturing the dark data, click
V Proj
to check the catpured image.
The end of dosimeter must be
placed at the white line.
Place the dosimeter at the area
indicated by the white arrow.
1. Click
Capture CTB
after
dark data acquisition and
press the exposure switch
for about 5 seconds.
2. After image acquistion, click
V proj
to
check the image and the position of the
dosimeter.
Summary of Contents for A9 PHT-30CSS
Page 1: ...vatech A9 Technical manual Model PHT 30CSS Version 1 01 English...
Page 12: ...Page 11 of 244 1 2 1 Vertical Frame Part...
Page 22: ...Page 21 of 244 1 2 3 5 Generator DG 07E22T2...
Page 26: ...Page 25 of 244...
Page 27: ...Page 26 of 244...
Page 30: ...Page 29 of 244 1 3 3 Sensor Part Connection Diagram...
Page 31: ...Page 30 of 244 1 3 4 CEPH SENSOR Part Connection Diagram...
Page 32: ...Page 31 of 244 1 3 5 Connection Diagram Total assembly...
Page 43: ...Page 42 of 244 16 Loosen ten bolts as shown in the image below...
Page 112: ...Page 111 of 244 5 Click the V Vol button Click the Ready button...
Page 180: ...Page 179 of 244 10 Select 50 in the M box and click the center of the flat washer...
Page 209: ...Page 208 of 244 8 5 Appendix 8 5 1 Main MCU Board Parameters...
Page 244: ...vatech A9 www vatech com...