DOC: BURN-IN STATION
DESC: Burn-In Test Procedures
PAGE:
REV
9 of 12
1
PREPARED BY: Sax Makthepharack REVISED BY:
CONTROL: INDUSTRIAL ENGINEERING
REV. DATE:
SHOWN
-
10 - 17 - 00
Bob Jolley
1.4
BURN-IN
Note:
The 3900 Connection and Establish Communications sections must be completed prior to performing Burn-In.
1.4.1
Remove injector nut and septum & install bake out nut with seal T-6013.
1.4.2
Open Burn-in_3900.smp by clicking and then clicking
Open SampleList....
1.4.3
In the list, click on
Burn-in_3900.smp
and then click
Open
.
CLICK HERE
STEP 1.4.2
CLICK HERE
STEP 1.4.3