DOC: BURN-IN STATION
DESC: Burn-In Test Procedures
PAGE:
REV
1 of 12
1
PREPARED BY: Sax Makthepharack REVISED BY:
CONTROL: INDUSTRIAL ENGINEERING
REV. DATE:
SHOWN
-
10 - 17 - 00
Bob Jolley
1.
3900GC GALILEO CONNECTION, ESTABLISH COMMUNICATIONS, FLOW CHECK AND BURN-IN
Warning:
Before and during, heating of the injector, make sure Helium is flowing through it
.
Note:
While using the computer, the term "click" refers to using the mouse to position the pointer to the required location and pushing the left
mouse button.
Note:
If the instrument fails to meet the required specifications, troubleshoot accordingly or contact a manufacturing engineer for assistance.
1.1
3900GC CONNECTION
1.1.1
With the power switch in the off position, connect the instrument to the correct voltage and attach computer cable. Connect and turn on
helium to the instrument. Install test column, w/adapter and seal, to injector (Column is ~18" x 1/8" packed column).
1.2
ESTABLISH COMMUNICATIONS
1.2.1
Turn on the computer. After booting up, the
Star Toolbar should be visible on the screen.
1.2.2
Click on the System Control/Automation
button.
CLICK HERE
STEP 1.2.2