DOC: 03-933001-01
DESC:
Assy, Basic Electrical, (120v Shown)
PAGE:
REV
21 of 23
1
PREPARED BY: Sax Makthepharack REVISED BY:
CONTROL: INDUSTRIAL ENGINEERING
REV. DATE:
SHOWN
-
07 - 18 - 00
Dave Maderos
1.10
FINAL WIRING/CONNECTIONS
1.10.1 Route the vent stepper motor wires through the cable clamps on the chassis top and channel, 03-933170-01 and twist.
1.10.2 Route the column fan motor wires through the standoff clamp closest the exhaust duct and twist. Place a tie wrap, 22-119650-00 around
both sets of fan wires, approximately 6 inches from chassis top.
1.10.3 Route the column oven probe/injector probe and switch wires through the flat cable clamp on the bottom of chassis top.
1.10.4 Obtain EFC flat ribbon cable 03-935508-01 and route cable through both clamps, 22-120322-00. Observe labels at each end of cable for
proper orientation.
1.10.5 Install 2 each 6-32 X 3/8" screws 12-901161-00 and 2 each #10 washers, 14-901030-00 onto power fail solenoid, 03-925467-03 as
shown. Lay solenoid on left side of chassis top and route the solenoid wires through the split grommet currently protecting the 1177 and
column probe wires.
12-901161-00, 2 PLCS
SCREW, SEMS, 6-32 X 3/8, SST
03-925467-03
SOLENOID, 3900 POWER FAIL
14-901030-00, 2 PLCS
WASHER, FLAT, #10, SST