DOC: 03-933007-00
DESC: Assy, Vent Door
PAGE:
REV
3 of 3
1
PREPARED BY: Sax Makthepharack REVISED BY:
CONTROL: INDUSTRIAL ENGINEERING
REV. DATE:
SHOWN
-
06 - 12 - 00
Dave Maderos
1.
VENT DOOR ASSEMBLY PROCEDURES
1.1
OPERATION IN SQUENCE
1.1.1
Place the Vent Door Shaft, 03-933152-01
with stepped end of shaft opposite the end plate
on Fixture T-8982 and align the holes on the
shaft with the holes on the fixtures.
1.1.2
Place two Vent Door Arms, 03-933153-01 on the fixture with the flange down and align holes with shaft holes. Secure the vent door arms to
shaft, using four each SST/STL Blind Rivets, 17-99938-00 and rivet gun as shown.
1.1.3
Rivet Vent Doors, 03-933154-01 onto vent door arms, using four each
Alumnium
Blind Rivets, 17-699907-00 from the top down. Make
sure the vent door flanges are properly oriented onto fixture as shown.
1.1.4
Install Vent Door Insulation, 03-933155-01 using one Flat Washer, 14-901074-00 and one SST/STL Blind Rivets, 17-99938-00 as shown.
1.1.5
Install second vent door insulation, as described in previous step.
1.1.6
Remove the Vent Door Assembly from the fixture and using a 3/32” Allen Wrench install Flex Coupling, 03-925565-01 onto the stepped end
of the vent door shaft as shown in Figure 2. Tighten coupling screw to 8-9 inch-lbs torque.
FIGURE 1
FIGURE 2
END PLATE (REF.)