DOC: BURN-IN STATION
DESC: Burn-In Test Procedures
PAGE:
REV
8 of 12
1
PREPARED BY: Sax Makthepharack REVISED BY:
CONTROL: INDUSTRIAL ENGINEERING
REV. DATE:
SHOWN
-
10 - 17 - 00
Bob Jolley
1.3.2
In the list, click on
Burn-in_Setup_3900.mth
and then click
Open
.
1.3.3
Critical data:
A) Go to
Setup...
to check the following:
I.
Column length = 30; Column bore = 320
II.
Gas Saver Time Out set to zero for burn-in purposes
B) The following can be checked on the status screen:
I.
Injector and Oven Temp. = 50 C
II.
Split State to on; Ratio to 100
III. Pressure set to 10 psi
C) Adjust sport valve flow to 5-10 mL/min.
D) Verify flow coming from test column is 30-100 mL/min.
E) Verify that there is flow out of EFC vent tube.
CLICK HERE
STEP 1.3.2
CLICK HERE
STEP 1.3.3