DOC: BURN-IN STATION
DESC: Burn-In Test Procedures
PAGE:
REV
5 of 12
1
PREPARED BY: Sax Makthepharack REVISED BY:
CONTROL: INDUSTRIAL ENGINEERING
REV. DATE:
SHOWN
-
10 - 17 - 00
Bob Jolley
1.2.11 Wait for new data to appear, click on the line corresponding to the 3900 being setup, then click the button.
1..12
Click the button.
CLICK HERE
STEP 1.2.11
CLICK HERE
STEP 1.2.12