Section 5 - Setup
MM113 - D10/D16 Hot Melt Unit
90
Procedure - Continued
If the software has the correct name, has been correctly converted for loading, is not corrupted, and is not the same
as the version already installed (if a software is already loaded), then the update will continue and the screen will
display the following:
If there is a problem in the copying of the new software or the USB memory stick is pulled out early resulting in a
failed programming attempt, the error screen will show with “
Error 4
” as shown below:
If the software is successfully updated and is starting, the screen will display the following and the program will run as
normal:
1. Remove the USB stick.
2. Cycle power.
The unit will force a re-initialization.
Hot Melt CPU uTasker Bootloader (119XX301) Error Codes
Error 1
:
USB Stick failed to mount
Error 2:
Software on USB Stick is the same that is loaded on CPU already
Error 3:
Software on USB Stick is not valid
(Does not have correct filename, file was
not converted using utility, or file is corrupted)
Error 4:
Programming failed during copying
Summary of Contents for D10
Page 1: ...D10 D16 Hot Melt Unit Manual Number MM113 Revision Date 8 2019 ...
Page 4: ......
Page 10: ...Table of Contents MM113 D10 D16 Hot Melt Unit 10 ...
Page 22: ...Section 2 Safety and Use MM113 D10 D16 Hot Melt Unit 22 ...
Page 24: ...Section 3 Basic Features MM113 D10 D16 Hot Melt Unit 24 ...
Page 38: ...Section 5 Setup MM113 D10 D16 Hot Melt Unit 38 Section 5 Setup Control Panel ...
Page 45: ...MM113 D10 D16 Hot Melt Unit Section 5 Setup 45 Set Language Continued Next Page ...
Page 46: ...Section 5 Setup MM113 D10 D16 Hot Melt Unit 46 Set Language Continued ...
Page 47: ...MM113 D10 D16 Hot Melt Unit Section 5 Setup 47 Set Temperature Units ...
Page 50: ...Section 5 Setup MM113 D10 D16 Hot Melt Unit 50 Hose Valve Temperature Continued ...
Page 57: ...MM113 D10 D16 Hot Melt Unit Section 5 Setup 57 Beacon 2 ...
Page 73: ...MM113 D10 D16 Hot Melt Unit Section 5 Setup 73 Sequential Start Valve ...
Page 84: ...Section 5 Setup MM113 D10 D16 Hot Melt Unit 84 VFD Parameters After 5 18 Before 5 18 ...
Page 98: ...Section 5 Setup MM113 D10 D16 Hot Melt Unit 98 ...
Page 106: ...Section 6 Operation MM113 D10 D16 Hot Melt Unit 106 ...
Page 117: ...MM113 D10 D16 Hot Melt Unit Section 9 Specifications 117 Dimensions D16 ...
Page 118: ...Section 9 Specifications MM113 D10 D16 Hot Melt Unit 118 ...
Page 121: ...MM113 D10 D16 Hot Melt Unit Section 10 Part Number List 121 D10 Unit Continued ...
Page 122: ...Section 10 Part Number List MM113 D10 D16 Hot Melt Unit 122 D10 Unit Continued ...
Page 125: ...MM113 D10 D16 Hot Melt Unit Section 10 Part Number List 125 D10 Base Unit 776xx884 ...
Page 126: ...Section 10 Part Number List MM113 D10 D16 Hot Melt Unit 126 D10 Base Unit 776xx884 Continued ...
Page 150: ...Section 10 Part Number List MM113 D10 D16 Hot Melt Unit 150 D16 Unit Continued ...
Page 151: ...MM113 D10 D16 Hot Melt Unit Section 10 Part Number List 151 D16 Unit Continued ...
Page 154: ...Section 10 Part Number List MM113 D10 D16 Hot Melt Unit 154 D16 Base Unit 776xx885 ...
Page 155: ...MM113 D10 D16 Hot Melt Unit Section 10 Part Number List 155 D16 Base Unit 776xx885 Continued ...
Page 206: ...Section 10 Part Number List MM113 D10 D16 Hot Melt Unit 206 ...
Page 208: ...Section 11 Warranty MM113 D10 D16 Hot Melt Unit 208 ...
Page 210: ...Section 12 Service MM113 D10 D16 Hot Melt Unit 210 ...
Page 214: ...Appendix B Power Requirements MM113 D10 D16 Hot Melt Unit 214 ...
Page 226: ...Appendix D Communication Protocols Modus MM113 D10 D16 Hot Melt Unit 226 ...
Page 269: ......