13
Valco Melton
IS0231
Vacuum Feeder Assembly Instructions
4.
If the vacuum feeder does not turn on, check that the feeder LED
is on. If the feeder LED is not on, check that the jumper cable and
level sensor cable are in the correct locations. If the feeder LED
is on, the height of the reed sensors needs to be readjusted.
5.
Once the vacuum feeder has stopped, open the lid, and make
sure the unit is filled and the adhesive level is about 1.5"±0.25"
from the top of the tank.
11. Select Internal ON Delay, based on the desired sensor, and
adjust the time for your application. The default time for the
sensor is 5 seconds.
7.
Access the setting screen by pressing
.
8.
Unlock the control by using the level 3 password: “6550”.
9.
Access the setting screen by pressing
again.
10. Access the “System” screen.
Finishing Attachments -
Continued
1.
Reconnect the power and turn the unit on.
2.
Connect air to the air valve, using the quick-disconnect provided.
3.
Activate the vacuum feeder by closing the lid and adjusting the
pressure gauge on the vacuum feeder lid. Let the tank fill with
adhesive.
Calibration
Summary of Contents for D10
Page 1: ...D10 D16 Hot Melt Unit Manual Number MM113 Revision Date 8 2019 ...
Page 4: ......
Page 10: ...Table of Contents MM113 D10 D16 Hot Melt Unit 10 ...
Page 22: ...Section 2 Safety and Use MM113 D10 D16 Hot Melt Unit 22 ...
Page 24: ...Section 3 Basic Features MM113 D10 D16 Hot Melt Unit 24 ...
Page 38: ...Section 5 Setup MM113 D10 D16 Hot Melt Unit 38 Section 5 Setup Control Panel ...
Page 45: ...MM113 D10 D16 Hot Melt Unit Section 5 Setup 45 Set Language Continued Next Page ...
Page 46: ...Section 5 Setup MM113 D10 D16 Hot Melt Unit 46 Set Language Continued ...
Page 47: ...MM113 D10 D16 Hot Melt Unit Section 5 Setup 47 Set Temperature Units ...
Page 50: ...Section 5 Setup MM113 D10 D16 Hot Melt Unit 50 Hose Valve Temperature Continued ...
Page 57: ...MM113 D10 D16 Hot Melt Unit Section 5 Setup 57 Beacon 2 ...
Page 73: ...MM113 D10 D16 Hot Melt Unit Section 5 Setup 73 Sequential Start Valve ...
Page 84: ...Section 5 Setup MM113 D10 D16 Hot Melt Unit 84 VFD Parameters After 5 18 Before 5 18 ...
Page 98: ...Section 5 Setup MM113 D10 D16 Hot Melt Unit 98 ...
Page 106: ...Section 6 Operation MM113 D10 D16 Hot Melt Unit 106 ...
Page 117: ...MM113 D10 D16 Hot Melt Unit Section 9 Specifications 117 Dimensions D16 ...
Page 118: ...Section 9 Specifications MM113 D10 D16 Hot Melt Unit 118 ...
Page 121: ...MM113 D10 D16 Hot Melt Unit Section 10 Part Number List 121 D10 Unit Continued ...
Page 122: ...Section 10 Part Number List MM113 D10 D16 Hot Melt Unit 122 D10 Unit Continued ...
Page 125: ...MM113 D10 D16 Hot Melt Unit Section 10 Part Number List 125 D10 Base Unit 776xx884 ...
Page 126: ...Section 10 Part Number List MM113 D10 D16 Hot Melt Unit 126 D10 Base Unit 776xx884 Continued ...
Page 150: ...Section 10 Part Number List MM113 D10 D16 Hot Melt Unit 150 D16 Unit Continued ...
Page 151: ...MM113 D10 D16 Hot Melt Unit Section 10 Part Number List 151 D16 Unit Continued ...
Page 154: ...Section 10 Part Number List MM113 D10 D16 Hot Melt Unit 154 D16 Base Unit 776xx885 ...
Page 155: ...MM113 D10 D16 Hot Melt Unit Section 10 Part Number List 155 D16 Base Unit 776xx885 Continued ...
Page 206: ...Section 10 Part Number List MM113 D10 D16 Hot Melt Unit 206 ...
Page 208: ...Section 11 Warranty MM113 D10 D16 Hot Melt Unit 208 ...
Page 210: ...Section 12 Service MM113 D10 D16 Hot Melt Unit 210 ...
Page 214: ...Appendix B Power Requirements MM113 D10 D16 Hot Melt Unit 214 ...
Page 226: ...Appendix D Communication Protocols Modus MM113 D10 D16 Hot Melt Unit 226 ...
Page 269: ......