6
Valco Melton
IS0234
External Pot Fill Instructions
Adjusting the Sensor
Delay Time
10. Access the setting screen by pressing
.
11. Unlock the control, using the level-3 password, “6550”.
12. Return to the setting screen by pressing
again.
13. Access the “System” screen.
14. Select External ON Delay, based on the desired sensor, and
adjust the time, dependent on the application.
The default time for either sensor is five
seconds.
8.
Reinsert the protective screw into the amplifier box.
9.
If the desired adhesive level was not reached, adjust the sensor
and repeat steps 18-19 of “Installing to the External Pot Fill
System” and 1-2 of “Calibrating the Sensor.” If the desired
adhesive level was reached, reattach the lid to the enclosure
box.
Calibrating the Sensor -
Continued
Summary of Contents for D10
Page 1: ...D10 D16 Hot Melt Unit Manual Number MM113 Revision Date 8 2019 ...
Page 4: ......
Page 10: ...Table of Contents MM113 D10 D16 Hot Melt Unit 10 ...
Page 22: ...Section 2 Safety and Use MM113 D10 D16 Hot Melt Unit 22 ...
Page 24: ...Section 3 Basic Features MM113 D10 D16 Hot Melt Unit 24 ...
Page 38: ...Section 5 Setup MM113 D10 D16 Hot Melt Unit 38 Section 5 Setup Control Panel ...
Page 45: ...MM113 D10 D16 Hot Melt Unit Section 5 Setup 45 Set Language Continued Next Page ...
Page 46: ...Section 5 Setup MM113 D10 D16 Hot Melt Unit 46 Set Language Continued ...
Page 47: ...MM113 D10 D16 Hot Melt Unit Section 5 Setup 47 Set Temperature Units ...
Page 50: ...Section 5 Setup MM113 D10 D16 Hot Melt Unit 50 Hose Valve Temperature Continued ...
Page 57: ...MM113 D10 D16 Hot Melt Unit Section 5 Setup 57 Beacon 2 ...
Page 73: ...MM113 D10 D16 Hot Melt Unit Section 5 Setup 73 Sequential Start Valve ...
Page 84: ...Section 5 Setup MM113 D10 D16 Hot Melt Unit 84 VFD Parameters After 5 18 Before 5 18 ...
Page 98: ...Section 5 Setup MM113 D10 D16 Hot Melt Unit 98 ...
Page 106: ...Section 6 Operation MM113 D10 D16 Hot Melt Unit 106 ...
Page 117: ...MM113 D10 D16 Hot Melt Unit Section 9 Specifications 117 Dimensions D16 ...
Page 118: ...Section 9 Specifications MM113 D10 D16 Hot Melt Unit 118 ...
Page 121: ...MM113 D10 D16 Hot Melt Unit Section 10 Part Number List 121 D10 Unit Continued ...
Page 122: ...Section 10 Part Number List MM113 D10 D16 Hot Melt Unit 122 D10 Unit Continued ...
Page 125: ...MM113 D10 D16 Hot Melt Unit Section 10 Part Number List 125 D10 Base Unit 776xx884 ...
Page 126: ...Section 10 Part Number List MM113 D10 D16 Hot Melt Unit 126 D10 Base Unit 776xx884 Continued ...
Page 150: ...Section 10 Part Number List MM113 D10 D16 Hot Melt Unit 150 D16 Unit Continued ...
Page 151: ...MM113 D10 D16 Hot Melt Unit Section 10 Part Number List 151 D16 Unit Continued ...
Page 154: ...Section 10 Part Number List MM113 D10 D16 Hot Melt Unit 154 D16 Base Unit 776xx885 ...
Page 155: ...MM113 D10 D16 Hot Melt Unit Section 10 Part Number List 155 D16 Base Unit 776xx885 Continued ...
Page 206: ...Section 10 Part Number List MM113 D10 D16 Hot Melt Unit 206 ...
Page 208: ...Section 11 Warranty MM113 D10 D16 Hot Melt Unit 208 ...
Page 210: ...Section 12 Service MM113 D10 D16 Hot Melt Unit 210 ...
Page 214: ...Appendix B Power Requirements MM113 D10 D16 Hot Melt Unit 214 ...
Page 226: ...Appendix D Communication Protocols Modus MM113 D10 D16 Hot Melt Unit 226 ...
Page 269: ......