Handgun Switch Kit Installation and Operation
Input Setup
1.
On the Power Board (151xx614), set “Switch 1” UP to the FILL
position. See Figure above.
2.
For Variable Speed Units (with a VFD) only: Locate the Motor
Control Board on the back side of the keypad and make sure
SW1 is in the FIX position. See figure below.
For Fixed Speed
Units, skip step 2 and
proceed to step 3.
3.
Setup is complete.
Testing
1.
Connect the hose/handgun to the D10 Unit.
2.
Connect the 4-pin circular connector from the Handgun Switch
Cable installed, to the mating connector from the hose.
3.
Turn ON the unit and wait for all zones to reach temperature and
for the System Ready light to come on.
4.
Enable the Pump by pressing the Manual Pump On/Off on the
Keypad.
5.
Pull the handgun trigger to activate the pump. Testing is
successful when the pump is enabled during the time the trigger
is held.
To tell if the pump is
enabled when the
trigger is held, listen
for the sound of the
pump activating. Also,
if there is glue in the
system, the handgun
will dispense glue.
Summary of Contents for D10
Page 1: ...D10 D16 Hot Melt Unit Manual Number MM113 Revision Date 8 2019 ...
Page 4: ......
Page 10: ...Table of Contents MM113 D10 D16 Hot Melt Unit 10 ...
Page 22: ...Section 2 Safety and Use MM113 D10 D16 Hot Melt Unit 22 ...
Page 24: ...Section 3 Basic Features MM113 D10 D16 Hot Melt Unit 24 ...
Page 38: ...Section 5 Setup MM113 D10 D16 Hot Melt Unit 38 Section 5 Setup Control Panel ...
Page 45: ...MM113 D10 D16 Hot Melt Unit Section 5 Setup 45 Set Language Continued Next Page ...
Page 46: ...Section 5 Setup MM113 D10 D16 Hot Melt Unit 46 Set Language Continued ...
Page 47: ...MM113 D10 D16 Hot Melt Unit Section 5 Setup 47 Set Temperature Units ...
Page 50: ...Section 5 Setup MM113 D10 D16 Hot Melt Unit 50 Hose Valve Temperature Continued ...
Page 57: ...MM113 D10 D16 Hot Melt Unit Section 5 Setup 57 Beacon 2 ...
Page 73: ...MM113 D10 D16 Hot Melt Unit Section 5 Setup 73 Sequential Start Valve ...
Page 84: ...Section 5 Setup MM113 D10 D16 Hot Melt Unit 84 VFD Parameters After 5 18 Before 5 18 ...
Page 98: ...Section 5 Setup MM113 D10 D16 Hot Melt Unit 98 ...
Page 106: ...Section 6 Operation MM113 D10 D16 Hot Melt Unit 106 ...
Page 117: ...MM113 D10 D16 Hot Melt Unit Section 9 Specifications 117 Dimensions D16 ...
Page 118: ...Section 9 Specifications MM113 D10 D16 Hot Melt Unit 118 ...
Page 121: ...MM113 D10 D16 Hot Melt Unit Section 10 Part Number List 121 D10 Unit Continued ...
Page 122: ...Section 10 Part Number List MM113 D10 D16 Hot Melt Unit 122 D10 Unit Continued ...
Page 125: ...MM113 D10 D16 Hot Melt Unit Section 10 Part Number List 125 D10 Base Unit 776xx884 ...
Page 126: ...Section 10 Part Number List MM113 D10 D16 Hot Melt Unit 126 D10 Base Unit 776xx884 Continued ...
Page 150: ...Section 10 Part Number List MM113 D10 D16 Hot Melt Unit 150 D16 Unit Continued ...
Page 151: ...MM113 D10 D16 Hot Melt Unit Section 10 Part Number List 151 D16 Unit Continued ...
Page 154: ...Section 10 Part Number List MM113 D10 D16 Hot Melt Unit 154 D16 Base Unit 776xx885 ...
Page 155: ...MM113 D10 D16 Hot Melt Unit Section 10 Part Number List 155 D16 Base Unit 776xx885 Continued ...
Page 206: ...Section 10 Part Number List MM113 D10 D16 Hot Melt Unit 206 ...
Page 208: ...Section 11 Warranty MM113 D10 D16 Hot Melt Unit 208 ...
Page 210: ...Section 12 Service MM113 D10 D16 Hot Melt Unit 210 ...
Page 214: ...Appendix B Power Requirements MM113 D10 D16 Hot Melt Unit 214 ...
Page 226: ...Appendix D Communication Protocols Modus MM113 D10 D16 Hot Melt Unit 226 ...
Page 269: ......