5
Valco Melton
IS0234
External Pot Fill Instructions
Calibrating the
Sensor
1.
Remove the protective screw from the amplifier box.
2.
Fill the tank with molten adhesive until it is at the desired shutoff
level.
3.
If the sensor light is orange, turn the screw on the amplifier box
counter-clockwise, carefully, until the light changes to green, and
then turn slowly clockwise until it chnges to orange.
Make sure the light changes to green
after 3 seconds.
4.
If the sensor light is green, turn the screw on the amplifier box
clockwise, carefully, until the light changes to orange.
5.
Close the lid.
6.
Remove some adhesive, so that the adhesive level is below the
sensor. Make sure the sensor light changes to red, and that the
parent machine begins to pump adhesive.
7.
Verify that the pump on the parent machine turns off after the unit is
filled to the desired level.
CAUTION!
CAUTION!
CAUTION!
CAUTION!
CAUTION!
Check the level of adhesive periodically to ensure the
sensor is working properly.
Installing to the External Pot Fill
System - Continued
20. Close the front operator Panel on the parent machine.
Summary of Contents for D10
Page 1: ...D10 D16 Hot Melt Unit Manual Number MM113 Revision Date 8 2019 ...
Page 4: ......
Page 10: ...Table of Contents MM113 D10 D16 Hot Melt Unit 10 ...
Page 22: ...Section 2 Safety and Use MM113 D10 D16 Hot Melt Unit 22 ...
Page 24: ...Section 3 Basic Features MM113 D10 D16 Hot Melt Unit 24 ...
Page 38: ...Section 5 Setup MM113 D10 D16 Hot Melt Unit 38 Section 5 Setup Control Panel ...
Page 45: ...MM113 D10 D16 Hot Melt Unit Section 5 Setup 45 Set Language Continued Next Page ...
Page 46: ...Section 5 Setup MM113 D10 D16 Hot Melt Unit 46 Set Language Continued ...
Page 47: ...MM113 D10 D16 Hot Melt Unit Section 5 Setup 47 Set Temperature Units ...
Page 50: ...Section 5 Setup MM113 D10 D16 Hot Melt Unit 50 Hose Valve Temperature Continued ...
Page 57: ...MM113 D10 D16 Hot Melt Unit Section 5 Setup 57 Beacon 2 ...
Page 73: ...MM113 D10 D16 Hot Melt Unit Section 5 Setup 73 Sequential Start Valve ...
Page 84: ...Section 5 Setup MM113 D10 D16 Hot Melt Unit 84 VFD Parameters After 5 18 Before 5 18 ...
Page 98: ...Section 5 Setup MM113 D10 D16 Hot Melt Unit 98 ...
Page 106: ...Section 6 Operation MM113 D10 D16 Hot Melt Unit 106 ...
Page 117: ...MM113 D10 D16 Hot Melt Unit Section 9 Specifications 117 Dimensions D16 ...
Page 118: ...Section 9 Specifications MM113 D10 D16 Hot Melt Unit 118 ...
Page 121: ...MM113 D10 D16 Hot Melt Unit Section 10 Part Number List 121 D10 Unit Continued ...
Page 122: ...Section 10 Part Number List MM113 D10 D16 Hot Melt Unit 122 D10 Unit Continued ...
Page 125: ...MM113 D10 D16 Hot Melt Unit Section 10 Part Number List 125 D10 Base Unit 776xx884 ...
Page 126: ...Section 10 Part Number List MM113 D10 D16 Hot Melt Unit 126 D10 Base Unit 776xx884 Continued ...
Page 150: ...Section 10 Part Number List MM113 D10 D16 Hot Melt Unit 150 D16 Unit Continued ...
Page 151: ...MM113 D10 D16 Hot Melt Unit Section 10 Part Number List 151 D16 Unit Continued ...
Page 154: ...Section 10 Part Number List MM113 D10 D16 Hot Melt Unit 154 D16 Base Unit 776xx885 ...
Page 155: ...MM113 D10 D16 Hot Melt Unit Section 10 Part Number List 155 D16 Base Unit 776xx885 Continued ...
Page 206: ...Section 10 Part Number List MM113 D10 D16 Hot Melt Unit 206 ...
Page 208: ...Section 11 Warranty MM113 D10 D16 Hot Melt Unit 208 ...
Page 210: ...Section 12 Service MM113 D10 D16 Hot Melt Unit 210 ...
Page 214: ...Appendix B Power Requirements MM113 D10 D16 Hot Melt Unit 214 ...
Page 226: ...Appendix D Communication Protocols Modus MM113 D10 D16 Hot Melt Unit 226 ...
Page 269: ......