RDA 400S
27.06.2011
ver.2
85
4.2
Checking the seed feed
Figure 4.2
The seed feed should be checked at the same time as the sowing depth, i.e. after every 4 hectares
or once an hour.
In connection with output verification, check that the machine appear to be outputing the same
amount from each coulter.
1 Raise the machine.
2 Start the fan.
3 Operate seed output for a short while by depressing the button
on the Control Station.
4 Check whether seed is output.
Start from the tramlining position, when all boxes, except those shut for tramlining, are supposed
to output seed. Then advance the control for the tramlining function and check to see if these coul-
ters now deliver seed.
Summary of Contents for Rapid RDA 400S
Page 2: ...2 27 06 2011 ver 2 ...
Page 4: ...4 ...
Page 16: ...Safety regulations 16 27 06 2011 ver 2 ...
Page 28: ...Instructions and settings 28 27 06 2011 ver 2 3 8 Horizontal alignment Figure 3 22 C B A ...
Page 89: ...RDA 400S 27 06 2011 ver 2 89 ...
Page 91: ...RDA 400S 27 06 2011 ver 2 91 Figure 5 4 ...
Page 97: ...RDA 400S 27 06 2011 ver 2 97 ...
Page 136: ...Appendices 136 27 06 2011 ver 2 ...
Page 137: ......