11-11 Fibre-Optic Network
Network Programming
Trio Motion Technology
readkey:
WAIT UNTIL KEY#3
GET #3,VR(100)
IF VR(100)<>20 THEN GOTO readkey
PRINT #10,"G";
WAIT UNTIL VR(200)=999
moves: 'Main motion routine
initax: 'Initialisation routine
The program on the two axis node could be as follows:
readinit:
IF NOT(KEY#4) THEN GOTO readinit
GET #4, VR(100)
IF VR(100)<>73 THEN GOTO readinit
GOSUB initax
SEND(11,1,200,99)
readsp:
IF NOT(KEY#4) THEN GOTO readsp
SPEED=VR(1)
GET#4,VR(100)
IF VR(100)<>71 THEN GOTO readsp
SEND(11,1,200,999)
moves: 'Main motion routine
initax: 'Initialisation routine
The previous example highlights a couple of useful points:
1)
The Motion Coordinator that is not controlling the membrane keypad must not
transmit anything to or via the keypad until the keypad has been set into network
mode by issuing the
SEND
command to give its keypad offset. This example uses
a simple form of handshaking by setting variables and sending characters to pre-
vent this situation but another alternative is for the controlling Motion Coordina-
tor to issue the
SEND
command on the first line of its program and for all other
Motion Coordinators in the network to have a delay at the start of their program
to allow time for the membrane keypads to be initialised.
2)
When using the
GET
# command it is a good idea to test for the buffer being empty
with the
KEY
# command, especially if reading input from a keypad, because it is
possible for the buffer to overflow with unpredictable results if it is not emptied
by reading from it with the
GET
# command.
Summary of Contents for Motion Coordinator Euro 205
Page 4: ......
Page 11: ...C H A P T E R CHAPTER0INTRODUCTION...
Page 12: ......
Page 27: ...C H A P T E R CHAPTER0HARDWARE OVERVIEW...
Page 28: ......
Page 35: ...Motion Coordinator Technical Reference Manual Hardware Overview 2 9 Motion Coordinator MC202...
Page 75: ...C H A P T E R CHAPTER0INSTALLATION...
Page 76: ......
Page 88: ...3 14 Installation EMC Considerations Trio Motion Technology...
Page 89: ...C H A P T E R CHAPTER0DAUGHTER BOARDS...
Page 90: ......
Page 126: ...4 38 Daughter Boards Profibus Daughter Board Trio Motion Technology...
Page 127: ...C H A P T E R CHAPTER0EXPANSION MODULES...
Page 128: ......
Page 158: ...5 32 Expansion Modules Communications Adaptors Trio Motion Technology...
Page 159: ...C H A P T E R CHAPTER0SYSTEM SETUP AND DIAGNOSTICS...
Page 160: ......
Page 173: ...C H A P T E R CHAPTER 0PROGRAMMING...
Page 174: ...7 2 Programming Trio Motion Technology...
Page 190: ...7 18 Programming Command Line Interface Trio Motion Technology...
Page 191: ...C H A P T E R CHAPTER0TRIO BASIC COMMANDS...
Page 192: ......
Page 200: ...8 10 Trio BASIC Commands Trio Motion Technology VERIFY 8 178 VFF_GAIN 8 178 VP_SPEED 8 179...
Page 254: ...8 64 Trio BASIC Commands Input Output Commands Trio Motion Technology...
Page 372: ...8 182Trio BASIC Commands Axis Parameters Trio Motion Technology...
Page 373: ...C H A P T E R CHAPTER 0PROGRAMMING EXAMPLES...
Page 374: ......
Page 389: ...C H A P T E R CHAPTER0SUPPORT SOFTWARE...
Page 390: ......
Page 472: ...10 84Support Software Project Autoloader Trio Motion Technology...
Page 473: ...C H A P T E R CHAPTER0FIBRE OPTIC NETWORK...
Page 474: ......
Page 486: ...11 14Fibre Optic Network Network Specification Trio Motion Technology...
Page 487: ...C H A P T E R CHAPTER0USING THE TRIO ACTIVEX CONTROL...
Page 488: ......
Page 518: ...12 32Using the Trio ActiveX Control Events Trio Motion Technology...
Page 519: ...C H A P T E R CHAPTER0COMMUNICATIONS PROTOCOLS...
Page 520: ......
Page 551: ...A P P E N D I X CHAPTER 0REFERENCE...
Page 552: ......